Irtishad Ahmad
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Irtishad Ahmad has a total of 12 co-authors. Here are the top co-authors by number of shared publications:
- Salman Azhar
Auburn University
2 shared publications - Ali Mostafavi
Department of Chemistry, Faculty of Science, Shahid Bahonar University of Kerman, Kerman, Iran
1 shared publication - Christin L. Perkinson
Erickson Consulting Engineers, 7201 Delainey Court, Sarasota, FL 34240, USA
1 shared publication - Jin Zhu
Southeast Univ
1 shared publication Li Wang
Assistant Professor, Dept. of Construction Management, College of Engineering and Computing, Florida International Univ., Miami, FL 33174
1 shared publicationMaung K. Sein
1 shared publication
Latest Publications
- 17 June 2014
- Published by American Society of Civil Engineers (ASCE)
- p. 1877-1884
System-of-Systems Modeling of Performance in Complex Construction Projects: A Multi-Method Simulation Paradigm
In this paper, a framework is proposed for the investigation of base level components in the assessment of performance in construction projects. A multi-method simulation paradigm is proposed to provide a structure for bottom-up abstraction and modeling of construction projects based on micro-behaviors at the base level. The proposed framework and the model are used in a numerical example related to concrete pouring to evaluate the impacts of micro-behaviors at the base level on project performance. The findings of the case study highlight the importance of modeling the base level components and demonstrate the capability of the proposed framework in enhancing the assessment of performance in construction projects.
- 17 June 2014
- Published by American Society of Civil Engineers (ASCE)
- p. 1877-1884
System-of-Systems Modeling of Performance in Complex Construction Projects: A Multi-Method Simulation Paradigm
In this paper, a framework is proposed for the investigation of base level components in the assessment of performance in construction projects. A multi-method simulation paradigm is proposed to provide a structure for bottom-up abstraction and modeling of construction projects based on micro-behaviors at the base level. The proposed framework and the model are used in a numerical example related to concrete pouring to evaluate the impacts of micro-behaviors at the base level on project performance. The findings of the case study highlight the importance of modeling the base level components and demonstrate the capability of the proposed framework in enhancing the assessment of performance in construction projects.
- 10 July 2010
- Published by Elsevier in Automation in Construction
- Vol. 19 (7) , 884-897
The use of computing technology in highway construction as a total jobsite management tool
- 10 July 2010
- Published by Elsevier in Automation in Construction
- Vol. 19 (7) , 884-897
The use of computing technology in highway construction as a total jobsite management tool
- 1 January 2010
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 136 (1) , 87-98
Action Research as a Proactive Research Method for Construction Engineering and Management
Academic research in applied disciplines such as construction engineering and management (CEM) has the dual mission of simultaneously contributing to the solution of practical problems and creating theoretical and conceptual knowledge. To do so, appropriate research approaches are needed. However, extant literature in the field has paid little attention to this issue and research methods used have been almost entirely either quantitative surveys or case studies. In this paper, action research (AR) is proposed as an answer to this knowledge gap. AR aims at building and testing theory within the context of solving an immediate practical problem in a real setting. The paper describes the underlying philosophy and application procedure of AR and highlights its strengths and weaknesses. Then, the applicability of the method to CEM is illustrated through a case study of improving access to information to support planning and decision making in a construction owner organization through designing and implementing...
- 1 January 2010
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 136 (1) , 87-98
Action Research as a Proactive Research Method for Construction Engineering and Management
Academic research in applied disciplines such as construction engineering and management (CEM) has the dual mission of simultaneously contributing to the solution of practical problems and creating theoretical and conceptual knowledge. To do so, appropriate research approaches are needed. However, extant literature in the field has paid little attention to this issue and research methods used have been almost entirely either quantitative surveys or case studies. In this paper, action research (AR) is proposed as an answer to this knowledge gap. AR aims at building and testing theory within the context of solving an immediate practical problem in a real setting. The paper describes the underlying philosophy and application procedure of AR and highlights its strengths and weaknesses. Then, the applicability of the method to CEM is illustrated through a case study of improving access to information to support planning and decision making in a construction owner organization through designing and implementing...
- 1 July 2009
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 135 (7) , 601-608
Estimating Work Zone Road User Cost for Alternative Contracting Methods in Highway Construction Projects
Highway construction often causes an additional road user cost (RUC) to motorists due to traffic flow interruption and congestion in work zones. Consequently, facility owners, such as the Florida Department of Transportation (FDOT), are often interested in using alternative contracting methods such as A+B contracting to expedite construction. Although many of these contracting methods rely on the RUC to determine incentives or disincentives, no standard method for RUC calculation is available to FDOT district engineers. In addition, existing methods are neither practical nor user-friendly for determining incentives or disincentives. This study intends to develop a RUC calculation procedure for the FDOT that focuses on using data that are easily accessible to FDOT district engineers, such as drawings and maintenance of traffic plans. The procedure is developed based on traffic analysis methods published in the Highway Capacity Manual, previous studies on user benefit analysis and work zones, and empirical ...
- 1 July 2009
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 135 (7) , 601-608
Estimating Work Zone Road User Cost for Alternative Contracting Methods in Highway Construction Projects
Highway construction often causes an additional road user cost (RUC) to motorists due to traffic flow interruption and congestion in work zones. Consequently, facility owners, such as the Florida Department of Transportation (FDOT), are often interested in using alternative contracting methods such as A+B contracting to expedite construction. Although many of these contracting methods rely on the RUC to determine incentives or disincentives, no standard method for RUC calculation is available to FDOT district engineers. In addition, existing methods are neither practical nor user-friendly for determining incentives or disincentives. This study intends to develop a RUC calculation procedure for the FDOT that focuses on using data that are easily accessible to FDOT district engineers, such as drawings and maintenance of traffic plans. The procedure is developed based on traffic analysis methods published in the Highway Capacity Manual, previous studies on user benefit analysis and work zones, and empirical ...
- 1 January 2009
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 25 (1) , 2
Editor’s Note
- 1 January 2009
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 25 (1) , 2
Editor’s Note
- 1 October 2008
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 24 (4) , 197
Editor’s Note
- 1 October 2008
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 24 (4) , 197
Editor’s Note
- 1 July 2008
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 24 (3) , 119
Editor’s Note
- 1 July 2008
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 24 (3) , 119
Editor’s Note
- 1 April 2008
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 24 (2) , 65
Editor’s Note
- 1 April 2008
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 24 (2) , 65
Editor’s Note
- 1 January 2008
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 24 (1) , 1
Editor’s Note
- 1 January 2008
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 24 (1) , 1
Editor’s Note
- 1 October 2007
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 23 (4) , 165
Editor’s Note
- 1 October 2007
- Published by American Society of Civil Engineers (ASCE) in Journal of Management in Engineering
- Vol. 23 (4) , 165
Editor’s Note