Determination of number of kanban in a cellular manufacturing system with considering rework process
- 19 February 2012
- journal article
- research article
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 63 (9-12) , 1177-1189
Abstract
No abstract availableKeywords
This publication has 41 references indexed in Scilit:
- Topology Synthesis of Multicomponent Structural Assemblies in Continuum DomainsJournal of Mechanical Design, 2011
- An optimal operating policy for the production system with reworkComputers & Industrial Engineering, 2009
- Optimal manufacturing batch size with rework process at a single-stage production systemComputers & Industrial Engineering, 2004
- Design of bi-criteria kanban system using simulated annealing techniqueComputers & Industrial Engineering, 2002
- Operations planning for a single-stage kanban system operating under linear demandInternational Journal of Production Research, 1998
- Adapting just-in-time manufacturing systems to preventive maintenance interruptionsProduction Planning & Control, 1998
- Operations planning for kanbans between two adjacent workstationsComputers & Industrial Engineering, 1996
- Scheduling in flowshop and cellular manufacturing systems with multiple objectives— a genetic algorithmic approachProduction Planning & Control, 1996
- Production planning for a multi-item, single-stage kanban systemInternational Journal of Production Research, 1994
- The determination of the optimal number of kanbans in a Just-In-Time production systemComputers & Industrial Engineering, 1993