A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraints
Authors:
- 1 April 2009
- journal article
- Published by Taylor & Francis in Journal of the Operational Research Society
- Vol. 60 (4) , 572-582
Abstract
Journal of the Operational Research Society (JORS) is the world's longest established OR journal and an official journal of The OR Society. It is the aim of the Journal to present papers which are relevant to practitioners, researchers, teachers, students and consumers of operational research, and which cover the theory, practice, history or methodology of OR.Keywords
This publication has 22 references indexed in Scilit:
- Minimizing makespan on a two-machine re-entrant flowshopJournal of the Operational Research Society, 2007
- Two-machine flow shop scheduling problems with minimal and maximal delays4OR, 2006
- A review and classification of heuristics for permutation flow-shop scheduling with makespan objectiveJournal of the Operational Research Society, 2004
- A hybrid two-stage flowshop with limited waiting time constraintsComputers & Industrial Engineering, 2003
- A two-machine flowshop sequencing problem with limited waiting time constraintsComputers & Industrial Engineering, 1995
- Heuristics for Flowshop Scheduling Problems Minimizing Mean TardinessJournal of the Operational Research Society, 1993
- A heuristic algorithm for the m-machine, n-job flow-shop sequencing problemOmega, 1983
- Two machine flow shop scheduling problems with sequence dependent setup times: A dynamic programming approachNaval Research Logistics Quarterly, 1974
- A GENERAL ALGORITHM FOR THEn × MFLOWSHOP SCHEDULING PROBLEM†International Journal of Production Research, 1968
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954