Long‐Term Optimal Operation of the Cascade Hydro‐Wind‐Photovoltaic Hybrid System considering Transmission Section Constraints
Authors:
Open Access
- 1 January 2023
- journal article
- research article
- Published by Wiley in Mathematical Problems in Engineering
- Vol. 2023 (1)
Abstract
With the sharply increased development of variable renewable energy resources (VRERs) in recent years, the hydro‐wind‐photovoltaic (PV) hybrid system (HWPHS) has the prospective to enhance the grid integration of VRERs. Nevertheless, the intense variation associated with wind and PV generation causes uncertainties in the long‐term operation of the HWPHS. To overcome this drawback, this paper develops a novel method to derive adaptive operating rules for a cascade HWPHS. First, a scenario‐generating method coupling Kernel density estimation with the copula function is proposed to characterize the wind and PV forecast errors. Second, based on the power generation scenarios, an optimal scheduling model for the cascade HWPHS considering transmission section constraints is proposed to simulate the hydro‐wind‐PV complementary operation; finally, the long‐term operating rules for the cascade HWPHS are extracted by grey relational analysis and BP neural network. As a case study, the HWPHS of the Wu River basin in China is chosen. Results demonstrate that the proposed model can effectively utilize the flexibility of cascade hydropower stations, improve transmission section utilization efficiency, and promote clean energy absorption.Keywords
Funding Information
- China Southern Power Grid (GZKJXM20210372)
This publication has 31 references indexed in Scilit:
- The role of large-scale energy storage design and dispatch in the power grid: A study of very high grid penetration of variable renewable resourcesApplied Energy, 2014
- Joint and respective effects of long- and short-term forecast uncertainties on reservoir operationsJournal of Hydrology, 2014
- Optimal Short-term Reservoir Operation with Integrated Long-term GoalsWater Resources Management, 2012
- An optimizing BP neural network algorithm based on genetic algorithmArtificial Intelligence Review, 2011
- Comparison of particle swarm optimization and dynamic programming for large scale hydro unit load dispatchEnergy Conversion and Management, 2009
- Evaluation of stochastic reservoir operation optimization modelsAdvances in Water Resources, 2009
- Limitations of Deterministic Optimization Applied to Reservoir OperationsJournal of Water Resources Planning and Management, 1999
- Simple conditions for the convergence of the Gibbs sampler and Metropolis-Hastings algorithmsStochastic Processes and their Applications, 1994
- Monte Carlo Optimization for Reservoir OperationWater Resources Research, 1984
- Remarks on Some Nonparametric Estimates of a Density FunctionThe Annals of Mathematical Statistics, 1956