Huaying Su
Huaying Su has a total of 29 co-authors. Here are the top co-authors by number of shared publications:
- Chuntian Cheng
Institute of Hydropower and Hydroinformatics, Dalian University of Technology, Dalian 116024, China
4 shared publications - Shengli Liao
Institute of Hydropower System and Hydroinformatics, Dalian University of Technology, Dalian 116024, China
3 shared publications - Benxi Liu
Institute of Hydropower and Hydroinformatics, Dalian University of Technology, Dalian, China
2 shared publications - Binbin Zhou
Yunnan Power Grid Co., Ltd, Kunming, China
2 shared publications - Shuai Yin
Institute of Hydropower & Hydroinformatics, Dalian University of Technology, Dalian, China
2 shared publications - Xinyu Wu
Institute of Hydropower & Hydroinformatics, Dalian University of Technology, Dalian, China
2 shared publications
Latest Publications
- Open Access
A Mid-Term Scheduling Method for Cascade Hydropower Stations to Safeguard Against Continuous Extreme New Energy Fluctuations
Continuous multi-day extremely low or high new energy outputs have posed significant challenges in relation to power supply and new energy accommodations. Conventional reservoir hydropower, with the advantage of controllability and the storage ability of reservoirs, can represent a reliable and low-carbon flexibility resource to safeguard against continuous extreme new energy fluctuations. This paper proposes a mid-term scheduling method for reservoir hydropower to enhance our ability to regulate continuous extreme new energy fluctuations. First, a data-driven scenario generation method is proposed to characterize the continuous extreme new energy output by combining kernel density estimation, Monte Carlo sampling, and the synchronized backward reduction method. Second, a two-stage stochastic hydropower–new energy complementary optimization scheduling model is constructed with the reservoir water level as the decision variable, ensuring that reservoirs have a sufficient water buffering capacity to free up transmission channels for continuous extremely high new energy outputs and sufficient water energy storage to compensate for continuous extremely low new energy outputs. Third, the mathematical model is transformed into a tractable mixed-integer linear programming (MILP) problem by using piecewise linear and triangular interpolation techniques on the solution, reducing the solution complexity. Finally, a case study of a hydropower–PV station in a river basin is conducted to demonstrate that the proposed model can effectively enhance hydropower’s regulation ability, to mitigate continuous extreme PV outputs, thereby improving power supply reliability in this hybrid renewable energy system.
Open AccessA Mid-Term Scheduling Method for Cascade Hydropower Stations to Safeguard Against Continuous Extreme New Energy Fluctuations
Continuous multi-day extremely low or high new energy outputs have posed significant challenges in relation to power supply and new energy accommodations. Conventional reservoir hydropower, with the advantage of controllability and the storage ability of reservoirs, can represent a reliable and low-carbon flexibility resource to safeguard against continuous extreme new energy fluctuations. This paper proposes a mid-term scheduling method for reservoir hydropower to enhance our ability to regulate continuous extreme new energy fluctuations. First, a data-driven scenario generation method is proposed to characterize the continuous extreme new energy output by combining kernel density estimation, Monte Carlo sampling, and the synchronized backward reduction method. Second, a two-stage stochastic hydropower–new energy complementary optimization scheduling model is constructed with the reservoir water level as the decision variable, ensuring that reservoirs have a sufficient water buffering capacity to free up transmission channels for continuous extremely high new energy outputs and sufficient water energy storage to compensate for continuous extremely low new energy outputs. Third, the mathematical model is transformed into a tractable mixed-integer linear programming (MILP) problem by using piecewise linear and triangular interpolation techniques on the solution, reducing the solution complexity. Finally, a case study of a hydropower–PV station in a river basin is conducted to demonstrate that the proposed model can effectively enhance hydropower’s regulation ability, to mitigate continuous extreme PV outputs, thereby improving power supply reliability in this hybrid renewable energy system.
- 25 January 2023
- Published by Springer Nature in Water Resources Management
- Vol. 37 (4) , 1539-1555
Runoff Forecast Model Based on an EEMD-ANN and Meteorological Factors Using a Multicore Parallel Algorithm
- 25 January 2023
- Published by Springer Nature in Water Resources Management
- Vol. 37 (4) , 1539-1555
Runoff Forecast Model Based on an EEMD-ANN and Meteorological Factors Using a Multicore Parallel Algorithm
- 19 January 2023
- Published by Springer Nature in Water Resources Management
- Vol. 37 (3) , 1109-1123
SSDP Model with Inflow Clustering for Hydropower System Operation
- 19 January 2023
- Published by Springer Nature in Water Resources Management
- Vol. 37 (3) , 1109-1123
SSDP Model with Inflow Clustering for Hydropower System Operation
- Open Access
- 1 January 2023
- Published by Wiley in Mathematical Problems in Engineering
- Vol. 2023 (1)
Long‐Term Optimal Operation of the Cascade Hydro‐Wind‐Photovoltaic Hybrid System considering Transmission Section Constraints
With the sharply increased development of variable renewable energy resources (VRERs) in recent years, the hydro‐wind‐photovoltaic (PV) hybrid system (HWPHS) has the prospective to enhance the grid integration of VRERs. Nevertheless, the intense variation associated with wind and PV generation causes uncertainties in the long‐term operation of the HWPHS. To overcome this drawback, this paper develops a novel method to derive adaptive operating rules for a cascade HWPHS. First, a scenario‐generating method coupling Kernel density estimation with the copula function is proposed to characterize the wind and PV forecast errors. Second, based on the power generation scenarios, an optimal scheduling model for the cascade HWPHS considering transmission section constraints is proposed to simulate the hydro‐wind‐PV complementary operation; finally, the long‐term operating rules for the cascade HWPHS are extracted by grey relational analysis and BP neural network. As a case study, the HWPHS of the Wu River basin in China is chosen. Results demonstrate that the proposed model can effectively utilize the flexibility of cascade hydropower stations, improve transmission section utilization efficiency, and promote clean energy absorption.
- 1 January 2023
- Published by Wiley in Mathematical Problems in Engineering
- Vol. 2023 (1)
Open AccessLong‐Term Optimal Operation of the Cascade Hydro‐Wind‐Photovoltaic Hybrid System considering Transmission Section Constraints
With the sharply increased development of variable renewable energy resources (VRERs) in recent years, the hydro‐wind‐photovoltaic (PV) hybrid system (HWPHS) has the prospective to enhance the grid integration of VRERs. Nevertheless, the intense variation associated with wind and PV generation causes uncertainties in the long‐term operation of the HWPHS. To overcome this drawback, this paper develops a novel method to derive adaptive operating rules for a cascade HWPHS. First, a scenario‐generating method coupling Kernel density estimation with the copula function is proposed to characterize the wind and PV forecast errors. Second, based on the power generation scenarios, an optimal scheduling model for the cascade HWPHS considering transmission section constraints is proposed to simulate the hydro‐wind‐PV complementary operation; finally, the long‐term operating rules for the cascade HWPHS are extracted by grey relational analysis and BP neural network. As a case study, the HWPHS of the Wu River basin in China is chosen. Results demonstrate that the proposed model can effectively utilize the flexibility of cascade hydropower stations, improve transmission section utilization efficiency, and promote clean energy absorption.
- 30 October 2022
- Published by Elsevier in Journal of Hydrology
- Vol. 614
DNN-SSDP for hydropower system operation using small state sets
- 30 October 2022
- Published by Elsevier in Journal of Hydrology
- Vol. 614
DNN-SSDP for hydropower system operation using small state sets
- Open Access
Short-Term Wind Power Prediction Based on LightGBM and Meteorological Reanalysis
With the expansion of wind power grid integration, the challenges of sharp fluctuations and high uncertainty in preparing the power grid day-ahead plan and short-term dispatching are magnified. These challenges can be overcome through accurate short-term wind power process prediction based on mining historical operation data and taking full advantage of meteorological forecast information. In this paper, adopting the ERA5 reanalysis dataset as input, a short-term wind power prediction framework is proposed, combining light gradient boosting machine (LightGBM), mutual information coefficient (MIC) and nonparametric regression. Primarily, the reanalysis data of ERA5 provide more meteorological information for the framework, which can help improve the model input features. Furthermore, MIC can identify effective feature subsets from massive feature sets that significantly affect the output, enabling concise understanding of the output. Moreover, LightGBM is a prediction method with a stronger ability of goodness-of-fit, which can fully mine the effective information of wind power historical operation data to improve the prediction accuracy. Eventually, nonparametric regression expands the process prediction to interval prediction, which significantly improves the utility of the prediction results. To quantitatively analyze the prediction results, five evaluation criteria are used, namely, the Pearson correlation coefficient (CORR), the root mean square error (RMSE), the mean absolute error (MAE), the index of agreement (IA) and Kling–Gupta efficiency (KGE). Compared with support vector regression (SVR), random forest (RF) and extreme gradient boosting (XGBoost) models, the present framework can make full use of meteorological information and effectively improve the prediction accuracy, and the generated output prediction interval can also be used to promote the safe operation of power systems.
Open AccessShort-Term Wind Power Prediction Based on LightGBM and Meteorological Reanalysis
With the expansion of wind power grid integration, the challenges of sharp fluctuations and high uncertainty in preparing the power grid day-ahead plan and short-term dispatching are magnified. These challenges can be overcome through accurate short-term wind power process prediction based on mining historical operation data and taking full advantage of meteorological forecast information. In this paper, adopting the ERA5 reanalysis dataset as input, a short-term wind power prediction framework is proposed, combining light gradient boosting machine (LightGBM), mutual information coefficient (MIC) and nonparametric regression. Primarily, the reanalysis data of ERA5 provide more meteorological information for the framework, which can help improve the model input features. Furthermore, MIC can identify effective feature subsets from massive feature sets that significantly affect the output, enabling concise understanding of the output. Moreover, LightGBM is a prediction method with a stronger ability of goodness-of-fit, which can fully mine the effective information of wind power historical operation data to improve the prediction accuracy. Eventually, nonparametric regression expands the process prediction to interval prediction, which significantly improves the utility of the prediction results. To quantitatively analyze the prediction results, five evaluation criteria are used, namely, the Pearson correlation coefficient (CORR), the root mean square error (RMSE), the mean absolute error (MAE), the index of agreement (IA) and Kling–Gupta efficiency (KGE). Compared with support vector regression (SVR), random forest (RF) and extreme gradient boosting (XGBoost) models, the present framework can make full use of meteorological information and effectively improve the prediction accuracy, and the generated output prediction interval can also be used to promote the safe operation of power systems.
- 22 October 2021
- Published by Springer Nature in Analog Integrated Circuits and Signal Processing
- Vol. 110 (1) , 175-183
A high-efficient dynamic comparator with low-offset in weak inversion region
- 22 October 2021
- Published by Springer Nature in Analog Integrated Circuits and Signal Processing
- Vol. 110 (1) , 175-183
A high-efficient dynamic comparator with low-offset in weak inversion region
- 1 August 2017
- Published by American Society of Civil Engineers (ASCE) in Journal of Hydrologic Engineering
- Vol. 22 (8)
Multicore Parallel Genetic Algorithm with Tabu Strategy for Rainfall-Runoff Model Calibration
Conceptual rainfall-runoff models (CRRMs) are widely used for flood forecasting and hydrologic simulations. However, parameter calibration poses a major challenge for using CRRMs, especially given that climate changes and effects of human activities often necessitate recalibration of CRRMs. Genetic algorithms (GAs) are one of the most widely used optimization techniques for hydrological model calibration, and have been widely and successfully used in model calibration; however, the complexity and high dimensionality of parameter calibration make them time-consuming and prone to local optima. Moreover, repetitive computation of fitness values in the GAs greatly reduces the efficiency. Therefore, new methods must be explored to improve the computational efficiency. Multicore parallel technology, which enables resource sharing and has low parallel costs and computing burdens, offers considerable benefits for parameter calibration. Thus, a multicore parallel genetic algorithm (MCPGA) based on the fork–join parallel framework with a tabu strategy is proposed in this paper for CRRM calibration. The method uses a multicore to divide the original task into several small subtasks and complete them concurrently, and adopts tabu strategy to avoid redundant computation in the GA to enhance the computing efficiency. The current methodology is applied to parameter calibration for the Xinanjiang model (which is a typical CRRM and has extensive applications in humid and semi-humid regions in China) of the Shuangpai Reservoir. Result comparisons between the MCPGA and serial GA indicate that the proposed method ensures a high degree of accuracy and significantly improves the computational efficiency.
- 1 August 2017
- Published by American Society of Civil Engineers (ASCE) in Journal of Hydrologic Engineering
- Vol. 22 (8)
Multicore Parallel Genetic Algorithm with Tabu Strategy for Rainfall-Runoff Model Calibration
Conceptual rainfall-runoff models (CRRMs) are widely used for flood forecasting and hydrologic simulations. However, parameter calibration poses a major challenge for using CRRMs, especially given that climate changes and effects of human activities often necessitate recalibration of CRRMs. Genetic algorithms (GAs) are one of the most widely used optimization techniques for hydrological model calibration, and have been widely and successfully used in model calibration; however, the complexity and high dimensionality of parameter calibration make them time-consuming and prone to local optima. Moreover, repetitive computation of fitness values in the GAs greatly reduces the efficiency. Therefore, new methods must be explored to improve the computational efficiency. Multicore parallel technology, which enables resource sharing and has low parallel costs and computing burdens, offers considerable benefits for parameter calibration. Thus, a multicore parallel genetic algorithm (MCPGA) based on the fork–join parallel framework with a tabu strategy is proposed in this paper for CRRM calibration. The method uses a multicore to divide the original task into several small subtasks and complete them concurrently, and adopts tabu strategy to avoid redundant computation in the GA to enhance the computing efficiency. The current methodology is applied to parameter calibration for the Xinanjiang model (which is a typical CRRM and has extensive applications in humid and semi-humid regions in China) of the Shuangpai Reservoir. Result comparisons between the MCPGA and serial GA indicate that the proposed method ensures a high degree of accuracy and significantly improves the computational efficiency.