Development of Prime Mover Loading on the Sucker Rod Lift During Coalbed Methane Production
Author:
- 1 June 2020
- journal article
- review article
- Published by Springer Nature in Iranian Journal of Science and Technology, Transactions of Mechanical Engineering
- Vol. 44 (2) , 263-272
Abstract
No abstract availableKeywords
Funding Information
- National Science and Technology Major Project (2011ZX05062)
- Higher Education Research and Development Project of Shandong Province (No. J17KA033)
This publication has 17 references indexed in Scilit:
- Pumping Unit Gearbox Torque Determination Method Based on Motor Behavior2015
- Prediction of Flowing Bottomhole Pressures for Two‐Phase Coalbed Methane WellsActa Geologica Sinica - English Edition, 2013
- Characteristics of non-Darcy flow in low-permeability reservoirsPetroleum Science, 2011
- Selection Criteria for Artificial Lift System Based on the Mechanical Limits: Case Study of Golfo San Jorge Basin2009
- Dewatering Unconventional Gas Resources With Sucker-Rod-Pumping EquipmentJournal of Petroleum Technology, 2007
- Modelling of Sucker Rod StringJournal of Canadian Petroleum Technology, 2005
- Best Method to Balance Torque Loadings on a Pumping Unit GearboxJournal of Canadian Petroleum Technology, 2005
- A Modern Approach to the Optimum Design of Sucker-Rod Pumping System2003
- Motor-Power/-Current Measurement To Improve Beam-Pump EfficiencyJournal of Petroleum Technology, 1998
- Dynamic Measurements of Beam-Pump ParametersSPE Production Engineering, 1992