New Time-Cost Trade-Off Model Considering the Sequence of Alternatives Between Activities
Authors:
Open Access
- 1 May 2015
- journal article
- research article
- Published by Taylor & Francis in Journal of Asian Architecture and Building Engineering
- Vol. 14 (2) , 379-386
Abstract
No abstract availableKeywords
This publication has 14 references indexed in Scilit:
- CPM Schedule Summarizing Function of the Beeline Diagramming MethodJournal of Asian Architecture and Building Engineering, 2012
- Optimization of Project Time-Cost Trade-Off Problem with Discounted Cash FlowsJournal of Construction Engineering and Management, 2011
- Fuzzy-based MOGA approach to stochastic time–cost trade-off problemAutomation in Construction, 2009
- A two-phase GA model for resource-constrained project schedulingAutomation in Construction, 2009
- Time-Cost Optimization of Construction Projects with Generalized Activity ConstraintsJournal of Construction Engineering and Management, 2005
- Stochastic Construction Time-Cost Trade-Off AnalysisJournal of Computing in Civil Engineering, 2000
- GA-Based Multicriteria Optimal Model for Construction SchedulingJournal of Construction Engineering and Management, 1999
- New computational results on the discrete time/cost trade-off problem in project networksJournal of the Operational Research Society, 1998
- Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off ProblemsJournal of Computing in Civil Engineering, 1997
- The LP/IP hybrid method for construction time-cost trade-off analysisConstruction Management and Economics, 1996