Robust scheduling of remanufacturing processes for the repair of turbine blades
Open Access
- 7 June 2023
- journal article
- research article
- Published by Elsevier in CIRP Annals
- Vol. 72 (1) , 425-428
Abstract
No abstract availableKeywords
This publication has 11 references indexed in Scilit:
- Closed-loop systems to circular economy: A pathway to environmental sustainability?CIRP Annals, 2022
- Daydreaming factoriesCIRP Annals, 2022
- A Robust Scheduling Framework for Re-Manufacturing Activities of Turbine BladesApplied Sciences, 2022
- A Kronecker Algebra Formulation for Markov Activity Networks with Phase-Type DistributionsMathematics, 2021
- Design, management and control of demanufacturing and remanufacturing systemsCIRP Annals, 2017
- Robust production control against propagation of disruptionsCIRP Annals, 2011
- Optimal control of reassembly with variable quality returns in a product remanufacturing systemCIRP Annals, 2011
- A simple and effective iterated greedy algorithm for the permutation flowshop scheduling problemEuropean Journal of Operational Research, 2007
- Measures of riskJournal of Banking & Finance, 2002
- Markov and Markov-Regenerative pert NetworksOperations Research, 1986