Switched max-plus linear-dual inequalities for makespan minimization: the case study of an industrial bakery shop1
Authors:
- 22 November 2023
- journal article
- research article
- Published by Elsevier in IFAC-PapersOnLine
- Vol. 56 (2) , 8628-8634
Abstract
No abstract availableKeywords
All Related Versions
This publication has 12 references indexed in Scilit:
- Critical subsystems in time interval modelsDiscrete Event Dynamic Systems, 2020
- Minimizing the makespan in a flow shop environment under minimum and maximum time-lag constraintsComputers & Industrial Engineering, 2019
- Control and State Estimation for max-plus Linear SystemsFoundations and Trends® in Systems and Control, 2018
- A new vision of approximate methods for the permutation flowshop to minimise makespan: State-of-the-art and computational evaluationEuropean Journal of Operational Research, 2017
- Embedding ant system in genetic algorithm for re-entrant hybrid flow shop scheduling problems with time window constraintsJournal of Intelligent Manufacturing, 2015
- Application of a modified GA, ACO and a random search procedure to solve the production scheduling of a case study bakeryExpert Systems with Applications, 2014
- Using max-plus to solve the job shop problem with time lagsIFAC Proceedings Volumes, 2012
- Application of an optimization problem in Max-Plus algebra to scheduling problemsDiscrete Applied Mathematics, 2006
- Modelling and control of discrete event systems using switching max-plus-linear systemsControl Engineering Practice, 2006
- Permutation flowshop scheduling problems with maximal and minimal time lagsComputers & Operations Research, 2006