Minimizing makespan on an m-machine re-entrant flowshop
Authors:
- 31 May 2008
- journal article
- Published by Elsevier in Computers & Operations Research
- Vol. 35 (5) , 1684-1696
Abstract
No abstract availableKeywords
This publication has 18 references indexed in Scilit:
- Minimizing makespan on a two-machine re-entrant flowshopJournal of the Operational Research Society, 2007
- Minimizing total tardiness of orders with reentrant lots in a hybrid flowshopInternational Journal of Production Research, 2005
- A case study on the multistage IC final testing scheduling problem with reentryInternational Journal of Production Economics, 2004
- Minimizing makespan in re-entrant permutation flow-shopsJournal of the Operational Research Society, 2003
- Decomposition methods for reentrant flow shops with sequence-dependent setup timesJournal of Scheduling, 2000
- Benchmarks for basic scheduling problemsEuropean Journal of Operational Research, 1993
- An efficient heuristic approach to the scheduling of jobs in a flowshopEuropean Journal of Operational Research, 1992
- Some efficient heuristic methods for the flow shop sequencing problemEuropean Journal of Operational Research, 1990
- Scheduling of re‐entrant flow shopsJournal of Operations Management, 1983
- A heuristic algorithm for the m-machine, n-job flow-shop sequencing problemOmega, 1983