Impact of Inspected Buffers on Production Parameters of Construction Processes
- 1 April 2009
- journal article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 135 (4) , 319-329
Abstract
This paper examines the production implications of quality control inspections conducted on the buffer between processes in a construction project by modeling the linkage between these processes. Inspection of partially completed work at the end of one activity but before the beginning of work by the next activity is fairly common. Work that is deemed to be of sufficient quality is then made available for the next activity. Work that is deemed insufficient requires rework, typically by the trade appropriate to the activity that fed into the buffer, to bring the work into compliance. This has implications for workload management for that trade, of course, as well as for the reliability of work flow to the successor or downstream processes. While such situations are common in all construction sectors, an example from the residential construction sector was examined via a simulation model augmented by field data collected from residential construction projects. The impacts of the work flow into the predecessor process, the inspection pass rate, and resource availability were examined. The inspection pass rate was found to dramatically affect the reliability of work flow, unless resources are unlimited. Furthermore, the inspection pass rate was found to be functionally related to the production parameters of the process.Keywords
This publication has 18 references indexed in Scilit:
- Application of the DEVS Framework in Construction Simulation2006
- An economic game theory model of subcontractor resource allocation behaviourConstruction Management and Economics, 2006
- Residential Construction and the Influence of Inspections on Cycle Time2005
- Role of Inventory Buffers in Construction Labor PerformanceJournal of Construction Engineering and Management, 2005
- Production System Loading–Cycle Time Relationship in Residential ConstructionJournal of Construction Engineering and Management, 2005
- Impact of Labor Factors on WorkflowJournal of Construction Engineering and Management, 2004
- Reliability Buffering for Construction ProjectsJournal of Construction Engineering and Management, 2004
- Implications of Even Flow Production Methodology for U.S. Housing IndustryJournal of Construction Engineering and Management, 2003
- Simphony1999
- Interaction between Subcycles: One Key to Improved MethodsJournal of Construction Engineering and Management, 1993