Howard H. Bashford
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Howard H. Bashford has a total of 12 co-authors. Here are the top co-authors by number of shared publications:
- Anil Sawhney
Associate Professor, Del E. Webb School of Construction, Arizona State Univ., Tempe, AZ 85287-0204
4 shared publications - Jacqueline Thompson
Research Associate, School of Sustainable Engineering and the Built Environment, Arizona State University, PO Box 870204, Tempe, Arizona 85287-0204
3 shared publications - Kenneth D. Walsh
Associate Professor, AGC-Paul S. Roel Chair of Construction Engineering and Management, Dept. of Civil and Environmental Engineering, San Diego State Univ., Mail Code 1324, San Diego, CA 92182
3 shared publications - Kenneth D. Walsh
Dean, San Diego State Univ.–Georgia, 5 MerabKostava St., 3rd Floor, Tbilisi 0108, Georgia; Professor and Chair, AGC-Paul S. Roel Chair in Construction Engineering and Management, Dept. of Civil, Construction, and Environmental Engineering, San Diego State Univ., 5500 Campanile Dr., San Diego, CA 92182-1324
2 shared publications A. Mund
1 shared publicationBrad C. A. Mason
Graduate Research Assistant, Del E. Webb School of Construction, Arizona State Univ., Mail Code 0204, Tempe, AZ 85287-0204
1 shared publication
Latest Publications
- 17 May 2012
- Published by American Society of Civil Engineers (ASCE)
- p. 1682-1688
Concrete Recycling and Utilization of Recycled Concrete: An Investigation of the Barriers and Drivers within the Phoenix Metropolitan Area
Contractors are looking for ways to incorporate sustainable business practices into their daily operations that reduce cost. Diverting waste from the landfill is one way that contractors can reduce the environmental impact of construction. Construction is the largest contributor to landfill waste and concrete accounts for a significant portion of that waste. In turn, concrete waste can easily be recycled and reused as aggregate base course under roadway pavements and building slabs. Using recycled concrete in this manner reduces the environmental impact of construction by diverting waste and limiting the amount of virgin aggregate required for construction. Since aggregate is a finite resource, recycling and using recycled concrete limits the quantity of natural resources needed to support construction activity. This research identified barriers and drivers associated with recycling concrete and using the recycled material in new construction in the Phoenix metropolitan area. Data was collected through interviews with general contractors, demolition contractors, concrete recyclers, and engineers, as well as observation of jobsite activities. The results of this research revealed that the infrastructure for recycling and reusing concrete material is in place but there is a need to establish that recycled concrete is an acceptable material for use as base material in the Phoenix area, and there is a need for education and awareness among the stakeholders. Factors impacting the decision to recycle versus sending concrete debris to a landfill were not cost and proximity as expected but were the result of existing relationships contractors have with disposal locations. The factors impacting whether or not to utilize recycled material were lack of enabling standard specifications, perception of risk, and the regulatory environment of the municipality where the construction takes place.
- 17 May 2012
- Published by American Society of Civil Engineers (ASCE)
- p. 1682-1688
Concrete Recycling and Utilization of Recycled Concrete: An Investigation of the Barriers and Drivers within the Phoenix Metropolitan Area
Contractors are looking for ways to incorporate sustainable business practices into their daily operations that reduce cost. Diverting waste from the landfill is one way that contractors can reduce the environmental impact of construction. Construction is the largest contributor to landfill waste and concrete accounts for a significant portion of that waste. In turn, concrete waste can easily be recycled and reused as aggregate base course under roadway pavements and building slabs. Using recycled concrete in this manner reduces the environmental impact of construction by diverting waste and limiting the amount of virgin aggregate required for construction. Since aggregate is a finite resource, recycling and using recycled concrete limits the quantity of natural resources needed to support construction activity. This research identified barriers and drivers associated with recycling concrete and using the recycled material in new construction in the Phoenix metropolitan area. Data was collected through interviews with general contractors, demolition contractors, concrete recyclers, and engineers, as well as observation of jobsite activities. The results of this research revealed that the infrastructure for recycling and reusing concrete material is in place but there is a need to establish that recycled concrete is an acceptable material for use as base material in the Phoenix area, and there is a need for education and awareness among the stakeholders. Factors impacting the decision to recycle versus sending concrete debris to a landfill were not cost and proximity as expected but were the result of existing relationships contractors have with disposal locations. The factors impacting whether or not to utilize recycled material were lack of enabling standard specifications, perception of risk, and the regulatory environment of the municipality where the construction takes place.
- 4 January 2012
- Published by American Society of Civil Engineers (ASCE)
- p. 98-104
The Business Case for Using Compressed Natural Gas Fuel in Concrete Mixer Trucks
Contractors are working towards defining their role in the movement towards sustainability in the built environment. Amongst all of the uncertainty surrounding this quest, one thing is certain: solutions must be based upon sound financial principles. Transportation during the construction process has been identified as one area where the environmental impacts of construction may be reduced. Compressed natural gas is an alternative fuel that could be used in concrete mixer trucks to increase the environmental performance of the construction process. The question is: will switching from diesel fuel to compressed natural gas save money while providing increased value during the construction process? This research examines the various costs, impacts, and savings involved in such a transition. Results of the study indicate the cost is a function of numerous operational parameters, government policies, and cost and availability of compressed natural gas. A general multi-variant financial model was developed to aid in the analysis. The model may be used by companies who wish to determine if switching to natural gas would be feasible for their operation.
- 4 January 2012
- Published by American Society of Civil Engineers (ASCE)
- p. 98-104
The Business Case for Using Compressed Natural Gas Fuel in Concrete Mixer Trucks
Contractors are working towards defining their role in the movement towards sustainability in the built environment. Amongst all of the uncertainty surrounding this quest, one thing is certain: solutions must be based upon sound financial principles. Transportation during the construction process has been identified as one area where the environmental impacts of construction may be reduced. Compressed natural gas is an alternative fuel that could be used in concrete mixer trucks to increase the environmental performance of the construction process. The question is: will switching from diesel fuel to compressed natural gas save money while providing increased value during the construction process? This research examines the various costs, impacts, and savings involved in such a transition. Results of the study indicate the cost is a function of numerous operational parameters, government policies, and cost and availability of compressed natural gas. A general multi-variant financial model was developed to aid in the analysis. The model may be used by companies who wish to determine if switching to natural gas would be feasible for their operation.
- 1 April 2009
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 135 (4) , 319-329
Impact of Inspected Buffers on Production Parameters of Construction Processes
This paper examines the production implications of quality control inspections conducted on the buffer between processes in a construction project by modeling the linkage between these processes. Inspection of partially completed work at the end of one activity but before the beginning of work by the next activity is fairly common. Work that is deemed to be of sufficient quality is then made available for the next activity. Work that is deemed insufficient requires rework, typically by the trade appropriate to the activity that fed into the buffer, to bring the work into compliance. This has implications for workload management for that trade, of course, as well as for the reliability of work flow to the successor or downstream processes. While such situations are common in all construction sectors, an example from the residential construction sector was examined via a simulation model augmented by field data collected from residential construction projects. The impacts of the work flow into the predecessor process, the inspection pass rate, and resource availability were examined. The inspection pass rate was found to dramatically affect the reliability of work flow, unless resources are unlimited. Furthermore, the inspection pass rate was found to be functionally related to the production parameters of the process.
- 1 April 2009
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 135 (4) , 319-329
Impact of Inspected Buffers on Production Parameters of Construction Processes
This paper examines the production implications of quality control inspections conducted on the buffer between processes in a construction project by modeling the linkage between these processes. Inspection of partially completed work at the end of one activity but before the beginning of work by the next activity is fairly common. Work that is deemed to be of sufficient quality is then made available for the next activity. Work that is deemed insufficient requires rework, typically by the trade appropriate to the activity that fed into the buffer, to bring the work into compliance. This has implications for workload management for that trade, of course, as well as for the reliability of work flow to the successor or downstream processes. While such situations are common in all construction sectors, an example from the residential construction sector was examined via a simulation model augmented by field data collected from residential construction projects. The impacts of the work flow into the predecessor process, the inspection pass rate, and resource availability were examined. The inspection pass rate was found to dramatically affect the reliability of work flow, unless resources are unlimited. Furthermore, the inspection pass rate was found to be functionally related to the production parameters of the process.
- 1 March 2007
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 133 (3) , 254-261
Production Equations for Unsteady-State Construction Processes
The production equation called Little’s law has been applied to construction data recently. However, Little’s law was derived for steady-state conditions assuming constant input and output rates and long production runs. Production in construction is inherently temporary, and learning curves and environmental influences often render input and output rates unequal and nonlinear. Starting with a conservation of mass formulation, general equations for work-in-process and cycle time for unsteady-state conditions and limited run production are developed. The motivation behind these equations is to explain common trends in production variables seen on construction projects. Previous studies have shown that when output from a construction production system is drastically increased, a significant upward impact is also seen on cycle time and work-in-process, and this work provides underlying theory and equations to explain these trends. Cycle time and work-in-process equations are presented as functions of time an...
- 1 March 2007
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 133 (3) , 254-261
Production Equations for Unsteady-State Construction Processes
The production equation called Little’s law has been applied to construction data recently. However, Little’s law was derived for steady-state conditions assuming constant input and output rates and long production runs. Production in construction is inherently temporary, and learning curves and environmental influences often render input and output rates unequal and nonlinear. Starting with a conservation of mass formulation, general equations for work-in-process and cycle time for unsteady-state conditions and limited run production are developed. The motivation behind these equations is to explain common trends in production variables seen on construction projects. Previous studies have shown that when output from a construction production system is drastically increased, a significant upward impact is also seen on cycle time and work-in-process, and this work provides underlying theory and equations to explain these trends. Cycle time and work-in-process equations are presented as functions of time an...
- 1 August 2005
- Published by American Society of Civil Engineers (ASCE)
Residential Construction and the Influence of Inspections on Cycle Time
A key component of the homebuilding process is inspection of construction by the building permitting agency within the jurisdiction where the work is performed. Several inspections are made throughout the construction process, but four of the inspections, pre-slab, framing, drywall, and final, lie on the work schedule critical path. This research focuses upon these particular inspections to determine if the inspection failures influence construction cycle time. Inspections of production homes are examined to determine how often these critical path inspections do not pass the first time, and how many reinspections are required. The number of days utilized to pass those inspections and reinspections is also measured and reported. The research finds that, on average, 12 days are required, to pass these critical path inspections, thus adding 8 days to the construction cycle time. When these inspections do not pass the first time the inspection is made, rework and reinspections must be completed before construction can proceed. The results show that this process may occur within the same day as the original inspection, and the subsequent inspection takes place the next day. More research is necessary to determine precisely why these inspection failures occur, what cost is incurred because of such failures, and in turn, what opportunities are lost.
- 1 August 2005
- Published by American Society of Civil Engineers (ASCE)
Residential Construction and the Influence of Inspections on Cycle Time
A key component of the homebuilding process is inspection of construction by the building permitting agency within the jurisdiction where the work is performed. Several inspections are made throughout the construction process, but four of the inspections, pre-slab, framing, drywall, and final, lie on the work schedule critical path. This research focuses upon these particular inspections to determine if the inspection failures influence construction cycle time. Inspections of production homes are examined to determine how often these critical path inspections do not pass the first time, and how many reinspections are required. The number of days utilized to pass those inspections and reinspections is also measured and reported. The research finds that, on average, 12 days are required, to pass these critical path inspections, thus adding 8 days to the construction cycle time. When these inspections do not pass the first time the inspection is made, rework and reinspections must be completed before construction can proceed. The results show that this process may occur within the same day as the original inspection, and the subsequent inspection takes place the next day. More research is necessary to determine precisely why these inspection failures occur, what cost is incurred because of such failures, and in turn, what opportunities are lost.
- 26 June 2003
- Published by Institute of Electrical and Electronics Engineers (IEEE)
Process mapping of residential foundation slab construction processes
With the purpose of mapping residential foundation slab construction processes, the authors collected the necessary process mapping information. After the completion of the process mapping for several common residential foundation slab construction processes, the team then used the process maps to identify potential process improvements and documented these in new, revised process maps. The residential foundation slab construction process mapping effort coupled with process simulation demonstrated the existence of opportunities for residential foundation slab construction process improvements. This has motivated the homebuilder partners to further pursue the issue by developing a residential foundation slab construction process to a stage where several prototype foundation slabs can be built. This report provides information on all steps accomplished and all issues involving the process mapping effort.
- 26 June 2003
- Published by Institute of Electrical and Electronics Engineers (IEEE)
Process mapping of residential foundation slab construction processes
With the purpose of mapping residential foundation slab construction processes, the authors collected the necessary process mapping information. After the completion of the process mapping for several common residential foundation slab construction processes, the team then used the process maps to identify potential process improvements and documented these in new, revised process maps. The residential foundation slab construction process mapping effort coupled with process simulation demonstrated the existence of opportunities for residential foundation slab construction process improvements. This has motivated the homebuilder partners to further pursue the issue by developing a residential foundation slab construction process to a stage where several prototype foundation slabs can be built. This report provides information on all steps accomplished and all issues involving the process mapping effort.
- 1 March 2003
- Published by American Society of Civil Engineers (ASCE) in Journal of Architectural Engineering
- Vol. 9 (1) , 11-17
Cost-Benefit Analysis of Residential Energy-Efficiency Upgrades in Phoenix, Arizona
With worldwide energy consumption rising, there is a need to reduce energy use of the housing stock. While this general idea is well-known, there is an overwhelming amount of product data and manufacturers claims through which the homebuilder or designer must sort to make informed selections of energy-efficient upgrades. The main objective of this research was to identify cost effective–energy efficient upgrades from a group of 16 commonly available choices, and rank them according to the most beneficial for the least cost. This study was conducted in Phoenix, Arizona, and included a sample of 30 production-style homes typical of the Phoenix metropolitan area. Energy-simulation software was used to perform energy evaluations and derive the benefits of each upgrade. The cost of each upgrade was obtained from a database of national average costs and from a local context. Differences in the selection of beneficial upgrades vary dramatically with the source of the cost information. This research provides a generic methodology that can be used by builders and designers to select appropriate energy-efficient upgrades for a given geographic area that will provide high operating benefits relative to the amount of capital investment.
- 1 March 2003
- Published by American Society of Civil Engineers (ASCE) in Journal of Architectural Engineering
- Vol. 9 (1) , 11-17
Cost-Benefit Analysis of Residential Energy-Efficiency Upgrades in Phoenix, Arizona
With worldwide energy consumption rising, there is a need to reduce energy use of the housing stock. While this general idea is well-known, there is an overwhelming amount of product data and manufacturers claims through which the homebuilder or designer must sort to make informed selections of energy-efficient upgrades. The main objective of this research was to identify cost effective–energy efficient upgrades from a group of 16 commonly available choices, and rank them according to the most beneficial for the least cost. This study was conducted in Phoenix, Arizona, and included a sample of 30 production-style homes typical of the Phoenix metropolitan area. Energy-simulation software was used to perform energy evaluations and derive the benefits of each upgrade. The cost of each upgrade was obtained from a database of national average costs and from a local context. Differences in the selection of beneficial upgrades vary dramatically with the source of the cost information. This research provides a generic methodology that can be used by builders and designers to select appropriate energy-efficient upgrades for a given geographic area that will provide high operating benefits relative to the amount of capital investment.
- 14 February 2000
- Published by American Society of Civil Engineers (ASCE)
- p. 889-897
Evaluation of Residential Construction Quality Based on Registrar of Contractor Complaint Filings
The Phoenix metropolitan area is undergoing rapid growth and development, with record new home construction figures each of 1996, 1997, and 1998. With the growth has come concerns expressed in the popular media about a number of growth related issues, including the possibility of a decrease in construction quality with the large volume. These concerns fit the general anti-growth sentiments focusing on the urban sprawl issue. In this study, all complaints filed at the Arizona Registrar of Contractors against builders of new homes in fiscal year 1998 were described. The volume of complaints was found to be relatively small. Complaints primarily related to the cosmetic aspects of the homes as compared to critical mechanical or structural issues, as might be expected from home buyers. A summary of the complaints by trade is presented, as well as by the size of the home builder. Volume of homes constructed was found to be a poor predictor of the volume of complaints recorded, as the largest builders experienced very few complaints.
- 14 February 2000
- Published by American Society of Civil Engineers (ASCE)
- p. 889-897
Evaluation of Residential Construction Quality Based on Registrar of Contractor Complaint Filings
The Phoenix metropolitan area is undergoing rapid growth and development, with record new home construction figures each of 1996, 1997, and 1998. With the growth has come concerns expressed in the popular media about a number of growth related issues, including the possibility of a decrease in construction quality with the large volume. These concerns fit the general anti-growth sentiments focusing on the urban sprawl issue. In this study, all complaints filed at the Arizona Registrar of Contractors against builders of new homes in fiscal year 1998 were described. The volume of complaints was found to be relatively small. Complaints primarily related to the cosmetic aspects of the homes as compared to critical mechanical or structural issues, as might be expected from home buyers. A summary of the complaints by trade is presented, as well as by the size of the home builder. Volume of homes constructed was found to be a poor predictor of the volume of complaints recorded, as the largest builders experienced very few complaints.
- 14 February 2000
- Published by American Society of Civil Engineers (ASCE)
- p. 36-40
Computer Usage by Contractors in Utah
The results of a survey conducted by the Associated General Contractors (AGC) stated that "[H]igh-loss firms make less use of computer(s) ... running their businesses." Paul Teicholz, in the 1999 ASCE Peurifoy Lecture, stated "CAD, CPM scheduling, and estimating software have not influenced how the majority of contractors carry out their day-to-day business". With statements like these concerning the impact of computer use, one naturally questions just how widely computers are used by constructors. To answer this question, the authors conducted a survey during the summer of 1997 to determine what percentage of construction organizations used computers in their businesses, and specifically if they used email or the internet. The survey sampled 58 randomly selected members of the Utah Chapter of the Associated General Contractors (AGC) and Associated Builders & Contractors (ABC). Responses were obtained from all 58 organizations surveyed. The companies were first sent a survey, then if the survey was not returned, a phone call was made to collect the information. Two of the questions focused on construction company use of email and/or an Internet website. A year and a half later, a follow up survey was conducted to determine what change had occurred in the number of companies using email and/or websites. Fifty-five of the 58 organizations were included in the follow-up survey. The other three could not be contacted.
- 14 February 2000
- Published by American Society of Civil Engineers (ASCE)
- p. 36-40
Computer Usage by Contractors in Utah
The results of a survey conducted by the Associated General Contractors (AGC) stated that "[H]igh-loss firms make less use of computer(s) ... running their businesses." Paul Teicholz, in the 1999 ASCE Peurifoy Lecture, stated "CAD, CPM scheduling, and estimating software have not influenced how the majority of contractors carry out their day-to-day business". With statements like these concerning the impact of computer use, one naturally questions just how widely computers are used by constructors. To answer this question, the authors conducted a survey during the summer of 1997 to determine what percentage of construction organizations used computers in their businesses, and specifically if they used email or the internet. The survey sampled 58 randomly selected members of the Utah Chapter of the Associated General Contractors (AGC) and Associated Builders & Contractors (ABC). Responses were obtained from all 58 organizations surveyed. The companies were first sent a survey, then if the survey was not returned, a phone call was made to collect the information. Two of the questions focused on construction company use of email and/or an Internet website. A year and a half later, a follow up survey was conducted to determine what change had occurred in the number of companies using email and/or websites. Fifty-five of the 58 organizations were included in the follow-up survey. The other three could not be contacted.