Multi‐objective optimization for stochastic failure‐prone job shop scheduling problem via hybrid of NSGA‐II and simulation method
- 28 July 2019
- journal article
- research article
- Published by Wiley in Expert Systems
- Vol. 39 (2) , e12455
Abstract
Production scheduling and reliability of machinery are prominent issues in flexible manufacturing systems that are led to decreasing of production costs and increasing of system efficiency. In this paper, multiobjective optimization of stochastic failure‐prone job shop scheduling problem is sought wherein that job processing time seems to be controllable. It endeavours to determine the best sequence of jobs, optimal production rate, and optimum preventive maintenance period for simultaneous optimization of three criteria of sum of earliness and tardiness, system reliability, and energy consumption. First, a new mixed integer programming model is proposed to formulate the problem. Then, by combining of simulation and NSGA‐II algorithm, a new algorithm is put forward for solving the problem. A set of Pareto optimal solutions is achieved through this algorithm. The stochastic failure‐prone job shop with controllable processing times has not been investigated in the earlier research, and for the first time, a new hedging point policy is presented. The computational results reveal that the proposed metaheuristic algorithm converges into optimal or near‐optimal solution. To end, results and managerial insights for the problem are presented.Keywords
This publication has 34 references indexed in Scilit:
- Joint production and major maintenance planning policy of a manufacturing system with deteriorating qualityInternational Journal of Production Economics, 2013
- A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO ruleOmega, 2013
- Single machine scheduling with controllable processing times to minimize total tardiness and earlinessComputers & Industrial Engineering, 2013
- A novel genetic algorithm for flexible job shop scheduling problems with machine disruptionsThe International Journal of Advanced Manufacturing Technology, 2013
- Optimal production control policy in unreliable batch processing manufacturing systems with transportation delayInternational Journal of Production Research, 2013
- A hybrid computer simulation-artificial neural network algorithm for optimisation of dispatching rule selection in stochastic job shop scheduling problemsInternational Journal of Production Research, 2012
- Production control in a failure-prone manufacturing network using discrete event simulation and automated response surface methodologyThe International Journal of Advanced Manufacturing Technology, 2010
- Supplier selection: A hybrid model using DEA, decision tree and neural networkExpert Systems with Applications, 2009
- Minimizing total tardiness on a single machine with controllable processing timesComputers & Operations Research, 2009
- A fast and elitist multiobjective genetic algorithm: NSGA-IIIEEE Transactions on Evolutionary Computation, 2002