Levelling crane workload in multi-yard rail-road container terminals
Authors:
- Arne SchulzASArne Schulz
- Malte FliednerMFMalte Fliedner
- Benedikt FiedrichBFBenedikt Fiedrich
- Christian PfeifferCPChristian Pfeiffer
- 1 September 2021
- journal article
- research article
- Published by Elsevier in European Journal of Operational Research
- Vol. 293 (3) , 941-954
Abstract
No abstract availableKeywords
This publication has 23 references indexed in Scilit:
- Determining crane areas for balancing workload among interfering and noninterfering cranesNaval Research Logistics (NRL), 2012
- Scheduling Freight Trains in Rail-Rail Transshipment YardsTransportation Science, 2011
- How to park freight trains on rail–rail transshipment yards: the train location problemOR Spectrum, 2011
- Optimized load planning of trains in intermodal transportationOR Spectrum, 2010
- Determining fixed crane areas in rail–rail transshipment yardsTransportation Research Part E: Logistics and Transportation Review, 2010
- Determining crane areas in intermodal transshipment yards: The yard partition problemEuropean Journal of Operational Research, 2010
- Crane scheduling with non-crossing constraintJournal of the Operational Research Society, 2006
- A m‐parallel crane scheduling problem with a non‐crossing constraintNaval Research Logistics (NRL), 2006
- An assignment model for dynamic load planning of intermodal trainsComputers & Operations Research, 2006
- Crane scheduling in container yards with inter-crane interferenceEuropean Journal of Operational Research, 2005