An Improved NSGA-II for Solving Reentrant Flexible Assembly Job Shop Scheduling Problem
Authors:
- 8 July 2023
- book chapter
- Published by Springer Nature
- p. 242-255
Abstract
No abstract availableKeywords
This publication has 10 references indexed in Scilit:
- An improved multi-objective evolutionary algorithm based on decomposition for solving re-entrant hybrid flow shop scheduling problem with batch processing machinesComputers & Industrial Engineering, 2022
- IMOEA/D to optimize job release problem for a reentrant hybrid flow shopComputers & Industrial Engineering, 2022
- A learning interactive genetic algorithm based on edge selection encoding for assembly job shop scheduling problemComputers & Industrial Engineering, 2021
- Heterogeneous Distributed Flow Shop Scheduling and Reentrant Hybrid Flow Shop Scheduling in Seamless Steel Tube Manufacturing2021
- Integrated Scheduling Algorithm of Complex Product with No-wait Constraint Based on Virtual ComponentJournal of Mechanical Engineering, 2020
- Multi‐Objective Reentrant Hybrid Flowshop Scheduling with Machines Turning on and off Control Strategy Using Improved Multi‐Verse Optimizer AlgorithmMathematical Problems in Engineering, 2019
- Decomposition-based classified ant colony optimization algorithm for scheduling semiconductor wafer fabrication systemComputers & Industrial Engineering, 2012
- Production scheduling of a MEMS manufacturing system with a wafer bonding processJournal of Manufacturing Systems, 2002
- A fast and elitist multiobjective genetic algorithm: NSGA-IIIEEE Transactions on Evolutionary Computation, 2002
- Set management1995