An Overview of Recent Research Results and Future Research Avenues Using Simulation Studies in Project Management
Open Access
- 24 October 2013
- journal article
- review article
- Published by Wiley in ISRN Computational Mathematics
- Vol. 2013, 1-19
Abstract
This paper gives an overview of three simulation studies in dynamic project scheduling integrating baseline scheduling with risk analysis and project control. This integration is known in the literature as dynamic scheduling. An integrated project control method is presented using a project control simulation approach that combines the three topics into a single decision support system. The method makes use of Monte Carlo simulations and connects schedule risk analysis (SRA) with earned value management (EVM). A corrective action mechanism is added to the simulation model to measure the efficiency of two alternative project control methods. At the end of the paper, a summary of recent and state-of-the-art results is given, and directions for future research based on a new research study are presented.Keywords
Funding Information
- Fonds Wetenschappelijk Onderzoek (G/0194/06, G/0095.10N, 3G015711, 01110003, BOF12GOA021)
- Fonds Wetenschappelijk Onderzoek (G/0194/06, G/0095.10N, 3G015711, 01110003, BOF12GOA021)
- Fonds Wetenschappelijk Onderzoek (G/0194/06, G/0095.10N, 3G015711, 01110003, BOF12GOA021)
- Bijzonder Onderzoeksfonds (G/0194/06, G/0095.10N, 3G015711, 01110003, BOF12GOA021)
- Bijzonder Onderzoeksfonds (G/0194/06, G/0095.10N, 3G015711, 01110003, BOF12GOA021)
This publication has 99 references indexed in Scilit:
- Modeling activity times by the Parkinson distribution with a lognormal core: Theory and validationEuropean Journal of Operational Research, 2012
- Maximizing the net present value of a project with linear time-dependent cash flowsInternational Journal of Production Research, 2001
- Scheduling project activities to maximize the net present value the case of linear time-dependent cash flowsInternational Journal of Production Research, 1999
- A heuristic treatment of tardiness and net present value criteria in resource constrained project schedulingInternational Journal of Physical Distribution & Logistics Management, 1998
- Resource-driven scheduling of repetitive activitiesConstruction Management and Economics, 1998
- A branch and bound algorithm for scheduling projects to maximize net present value: The case of time dependent, contingent cash flowsInternational Journal of Production Research, 1997
- An uncertainty importance measure of activities in PERT networksInternational Journal of Production Research, 1997
- Using discounted cash flow heuristics to improve project net present valveJournal of Operations Management, 1996
- The resource constrained time/cost tradeoff project scheduling problem with discounted cash flowsJournal of Operations Management, 1996
- USING A LATE‐START RESOURCE‐CONSTRAINED PROJECT SCHEDULE TO IMPROVE PROJECT NET PRESENT VALUE*Decision Sciences, 1987