A tight approximation algorithm for problem $P2\rightarrow D|v=1,c=1|C_{\max }$
- 5 June 2020
- journal article
- research article
- Published by Springer Nature in Journal of Combinatorial Optimization
- Vol. 44 (4) , 2195-2206
Abstract
No abstract availableKeywords
Funding Information
- Excellent Young Scientists Fund (11701062)
- National Natural Science Foundation of China (11971091)
This publication has 16 references indexed in Scilit:
- A new heuristic algorithm for the machine scheduling problem with job delivery coordinationTheoretical Computer Science, 2009
- On the machine scheduling problem with job delivery coordinationEuropean Journal of Operational Research, 2007
- Machine scheduling with deliveries to multiple customer locationsEuropean Journal of Operational Research, 2005
- Machine scheduling with job delivery coordinationEuropean Journal of Operational Research, 2004
- Makespan minimization for flow-shop problems with transportation times and a single robotDiscrete Applied Mathematics, 2001
- Scheduling with batching: A reviewEuropean Journal of Operational Research, 2000
- heuristics for parallel machine scheduling with delivery timesActa Informatica, 1994
- Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and ComplexityJournal of the Operational Research Society, 1992
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey1979
- Worst-Case Performance Bounds for Simple One-Dimensional Packing AlgorithmsSIAM Journal on Computing, 1974