A Novel Approach for Rehabilitation of a Subtotal Maxillectomy Patient with Immediately Loaded Basal Implant‐Supported Prosthesis: 4 Years Follow‐Up
Open Access
- 1 January 2020
- journal article
- case report
- Published by Wiley in Case Reports in Dentistry
- Vol. 2020 (1) , 9650164
Abstract
The prosthetic rehabilitation of maxillary defect can be achieved successfully by using an implant‐supported prosthesis. The use of remote bony areas such as the zygomatic bone in cases of large defects provides an innovative substitute for free vascularized osteocutaneous flaps and the solution to flap failures. This report describes the rehabilitation of a 22‐year‐old female with a subtotal maxillectomy using an immediately loaded basal implant‐supported prosthesis. Four basal cortical screw implants (BCS®) are inserted; 1 on the contralateral nasal floor, 2 implants in the pterygoid plates, and the last in the zygomatic bone using cone beam computed tomography scans. The prosthesis was constructed and cemented in 3 days. The surgical and prosthetic procedures were performed without any obstacles. After 4 years in function, the patient was highly satisfied with the treatment as it improved her mastication, speech, aesthetic and returned her self‐esteem. To our knowledge, this is the first clinical report detailing the use of basal implant‐retained obturator in a subtotal maxillectomy patient.Keywords
This publication has 19 references indexed in Scilit:
- Dental Implants in Oral Rehabilitation of A Maxillary Cancer Reconstruction: A Case ReportJournal of Oral Implantology, 2015
- Function of obturator prosthesis after maxillectomy and prosthetic obturator rehabilitationBrazilian Journal of Otorhinolaryngology, 2015
- Implants in the zygomatic bone for maxillary prosthetic rehabilitation: a systematic reviewInternational Journal of Oral and Maxillofacial Surgery, 2014
- Maxillary reconstruction: Current concepts and controversiesIndian Journal of Plastic Surgery, 2014
- Quality of Life After Maxillectomy and Prosthetic Obturator RehabilitationJournal of Oral and Maxillofacial Surgery, 2013
- Zygoma Implant-Supported Prosthetic Rehabilitation of a Patient After Subtotal Bilateral MaxillectomyJournal of Craniofacial Surgery, 2013
- Current Strategies in Reconstruction of Maxillectomy DefectsJAMA Otolaryngology–Head & Neck Surgery, 2011
- Prosthodontic guidelines for surgical reconstruction of the maxilla: A classification system of defectsThe Journal of Prosthetic Dentistry, 2001
- Remote implant anchorage for the rehabilitation of maxillary defectsThe Journal of Prosthetic Dentistry, 2001
- Maxillectomy and its classificationHead & Neck, 1997