Resource Leveling in Projects with Stochastic Minimum Time Lags
Authors:
- 1 April 2019
- journal article
- research article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 145 (4)
Abstract
No abstract availableKeywords
This publication has 48 references indexed in Scilit:
- Hybrid meta-heuristic methods for the multi-resource leveling problem with activity splittingAutomation in Construction, 2012
- Proactive policies for the stochastic resource-constrained project scheduling problemEuropean Journal of Operational Research, 2011
- A survey of variants and extensions of the resource-constrained project scheduling problemEuropean Journal of Operational Research, 2010
- Resource‐Constrained Project Scheduling for Timely Project Completion with Stochastic Activity DurationsProduction and Operations Management, 2009
- Proactive heuristic procedures for robust project scheduling: An experimental analysisEuropean Journal of Operational Research, 2008
- Heuristic procedures for reactive project schedulingComputers & Industrial Engineering, 2007
- An optimal construction resource leveling scheduling simulation modelCanadian Journal of Civil Engineering, 2002
- Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraintsEuropean Journal of Operational Research, 2000
- A fuzzy optimal model for construction resource leveling schedulingCanadian Journal of Civil Engineering, 1999
- Resource levelling for projects with schedule-dependent time windowsEuropean Journal of Operational Research, 1999