Ant colony optimization algorithm for stochastic project crashing problem in PERT networks using MC simulation
- 3 May 2009
- journal article
- research article
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 45 (11-12) , 1051-1067
Abstract
No abstract availableKeywords
This publication has 46 references indexed in Scilit:
- A new ant colony optimization algorithm for the multidimensional Knapsack problemComputers & Operations Research, 2008
- The discrete time/cost trade-off problem: extensions and heuristic proceduresJournal of Scheduling, 2007
- New computational results on the discrete time/cost trade-off problem in project networksJournal of the Operational Research Society, 1998
- Optimal procedures for the discrete time/cost trade-off problem in project networksEuropean Journal of Operational Research, 1996
- A multi-stage non-deterministic model for project scheduling under resources constraintsEuropean Journal of Operational Research, 1990
- A goal programming model for project crashing with piecewise linear time-cost trade-offEngineering Costs and Production Economics, 1986
- A Dynamic Programming Solution to Cost-Time Tradeoff for CPMManagement Science, 1975
- Optimum Time Compression in Project SchedulingManagement Science, 1970
- Decision CPM: A Method for Simultaneous Planning, Scheduling, and Control of ProjectsOperations Research, 1967
- A Network Flow Computation for Project Cost CurvesManagement Science, 1961