Effects of pre-insertion resistor on energization of compensated lines

Authors:

Abstract
Shunt reactors are commonly applied as a cost-effective way to provide inductive reactive power compensation for transmission lines. When energizing transmission lines with high compensation levels, current zero-crossing missing phenomena often appear due to the excessively long arcing time caused by the generated dc components from shunt reactors. The resulting possible circuit breaker (CB) failure can endanger power system security in extreme situations. One of the effective countermeasures, the pre-insertion resistor, has been applied in industry to prevent current zero-crossing missing. However, the insertion time of the pre-insertion resistor and the corresponding transients are seldom discussed in the current studies. In order to analyze the corresponding impact on the CB performance, this paper develops a generic electromagnetic model on the Siemens PTI software PSS®NETOMAC. An energization case of a compensated line is simulated. A mathematical method is proposed to estimate the amplitude of the dc component generated during energization. The simulation results show that the insertion time of the pre-insertion resistor has a significant impact on the CB performance. It is significant to identify an appropriate insertion time to ensure a successful CB operation.