A two-stage flow-shop scheduling problem with incompatible job families and limited waiting time
Authors:
- 17 May 2019
- journal article
- research article
- Published by Taylor & Francis in Engineering Optimization
- Vol. 52 (3) , 484-506
Abstract
This article presents a two-stage flow-shop problem with a batch machine followed by a discrete machine to minimize makespan. Jobs from incompatible job families should be processed on the discrete machine within a limited waiting time after completion of the batch process, which deviates from the instability of intermediate products in many industries, such as semiconductor and metal-rolling industries. Tight lower bounds and three heuristics are developed based on the problem’s properties. Then, a hybrid membrane computing metaheuristic called the HMC algorithm is proposed, in which a dynamic membrane structure is applied to perform effective exploration, and a variable neighbourhood search is embedded in each iteration. In addition, a problem-dependent speed-up neighbourhood is employed to improve the efficiency. Numerical experiments demonstrate that the proposed algorithms can achieve competitive performance compared with state-of-the-art algorithms.Keywords
Funding Information
- Social Science Research Project of Shanghai (2017EGL009)
- National Natural Science Foundation of China (71840003, 71632008)
- MOE (Ministry of Education in China) Project of Humanities and Social Sciences (19YJA790028)
This publication has 48 references indexed in Scilit:
- Variable neighbourhood search: methods and applicationsAnnals of Operations Research, 2009
- A parallel particle swarm optimization algorithm for multi-objective optimization problemsEngineering Optimization, 2009
- Dynamic production control in a serial line with process queue time constraintInternational Journal of Production Research, 2009
- A branch-and-bound algorithm for a two-machine flowshop scheduling problem with limited waiting time constraintsJournal of the Operational Research Society, 2009
- A hybrid two-stage flowshop with limited waiting time constraintsComputers & Industrial Engineering, 2003
- The particle swarm - explosion, stability, and convergence in a multidimensional complex spaceIEEE Transactions on Evolutionary Computation, 2002
- Application of genetic algorithms for scheduling batch-discrete production systemProduction Planning & Control, 2002
- Computing with MembranesJournal of Computer and System Sciences, 2000
- Scheduling batch processing machines with incompatible job familiesInternational Journal of Production Research, 1995
- A two-machine flowshop sequencing problem with limited waiting time constraintsComputers & Industrial Engineering, 1995