Discrete production workstation with two types of imperfect items: determining the optimal promise time
- 2 March 2023
- journal article
- research article
- Published by Taylor & Francis in International Journal of Systems Science: Operations & Logistics
- Vol. 10 (1)
Abstract
This paper presents a discrete production system where units are manufactured and reworked, if needed, one at a time using the same resources. Examples of these systems include products that involve extensive manual operations such as welding or manual assembly of intricate items. This industrial setting is not discussed in the literature. The major difficulty in studying these systems is the huge number of possible sequences of conforming and non-conforming units. This paper presents a very efficient approach to analyse these systems. We generate the system statistics for short production periods. In order to study the long-term behaviour of system statistics, we introduce renewal cycles. A major issue facing a manufacturer using these systems is determining the time it takes to produce a given customer order which is called promise time. This paper aims to find the optimal promise time that maximises the expected profit. Numerical experiments show that the expected profit is inversely proportional to the processing times. In addition, the expected profit is sensitive to the parameters; a change of ± 0.05 in the probability of having a conforming unit may result in a 25% change in the expected profit.Keywords
This publication has 61 references indexed in Scilit:
- Batching for work and rework processes on dedicated facilities to minimize the makespanOmega, 2010
- Optimal production run length with imperfect production processes and backorder in fuzzy random environmentComputers & Industrial Engineering, 2010
- Economic production quantity with rework process at a single-stage manufacturing system with planned backordersComputers & Industrial Engineering, 2009
- Erratum to “Optimal manufacturing batch size with rework process at a single-stage production system” [Comput. Ind. Eng. 47 (1) (2004) 77–89]Computers & Industrial Engineering, 2005
- Determining the optimal lot size for the finite production model with random defective rate, the rework process, and backloggingEngineering Optimization, 2003
- Economic lot scheduling problem with imperfect production processes and setup timesJournal of the Operational Research Society, 2002
- Planning and control of rework in the process industries: A reviewProduction Planning & Control, 2002
- Production lot sizing with the reworking of imperfect quality items producedProduction Planning & Control, 2001
- Economic Production Lot Size Model with Variable Production Rate and Imperfect QualityJournal of the Operational Research Society, 1994
- Economic Production Cycles with Imperfect Production ProcessesIIE Transactions, 1986