Omar G. Alsawafy
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Interests
Omar G. Alsawafy has a total of 24 co-authors. Here are the top co-authors by number of shared publications:
- Ahmed M. Attia
Department of Industrial and Systems Engineering, King Fahd University of Petroleum & Minerals, Dhahran, Saudi Arabia
4 shared publications Ahmad Al Hanbali
3 shared publications- Awsan Mohammed
Architectural Engineering and Construction Management Department, King Fahd University of Petroleum and Minerals, Dhahran 31261, Saudi Arabia
3 shared publications - Ahmad Al Hanbali
Department of Industrial and Systems Engineering, KFUPM, Dhahran, Saudi Arabia
2 shared publications Ahmed M. Ghaithan
2 shared publicationsAwsan Mohammed
Assistant Professor, Dept. of Architectural Engineering and Construction Management, King Fahd Univ. of Petroleum and Minerals, Dhahran 31261, Saudi Arabia; Assistant Professor, Interdisciplinary Research Center of Smart Mobility and Logistics, King Fahd Univ. of Petroleum and Minerals, Dhahran 31261, Saudi Arabia
2 shared publications
Latest Publications
- Open Access
- 15 May 2026
- Published by Elsevier in Results in Engineering
- Vol. 30
Machine learning models integrated with strategic theories for predicting delivery time in supply chains
- 15 May 2026
- Published by Elsevier in Results in Engineering
- Vol. 30
Open AccessMachine learning models integrated with strategic theories for predicting delivery time in supply chains
- Open Access
- 12 January 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. PP, 1
Flexible Inspection Approach for Maintenance Planning in Multi-Component Systems with Dependencies and Service Logistics
Maintenance planning is a complex task, influenced by the interdependence of components and the critical role of service logistics in sustaining operational continuity. Traditional approaches often treat components independently or consider only limited dependency types, leading to suboptimal decisions and increased costs. This paper presents a simulation-based optimization framework for condition-based maintenance that integrates multi-component systems while accounting for stochastic, structural, economic, and resource dependencies. The proposed methodology unifies periodic and non-periodic inspection strategies within the model, supported by a mathematical formulation that enhances flexibility in identifying cost-effective maintenance and inspection policies. Service logistics are explicitly incorporated by triggering spare-part replenishment based on degradation thresholds rather than fixed time intervals, ensuring timely availability, minimizing components holding costs, and reducing downtime risk due to stockouts. Comparative analysis with existing approaches in the literature demonstrates significant improvements in both cost efficiency and system availability. Simulation experiments further confirm the superiority of non-periodic inspection strategies over conventional periodic policies across most operational scenarios, with periodic inspections remaining preferable only under specific conditions.
- 12 January 2026
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. PP, 1
Open AccessFlexible Inspection Approach for Maintenance Planning in Multi-Component Systems with Dependencies and Service Logistics
Maintenance planning is a complex task, influenced by the interdependence of components and the critical role of service logistics in sustaining operational continuity. Traditional approaches often treat components independently or consider only limited dependency types, leading to suboptimal decisions and increased costs. This paper presents a simulation-based optimization framework for condition-based maintenance that integrates multi-component systems while accounting for stochastic, structural, economic, and resource dependencies. The proposed methodology unifies periodic and non-periodic inspection strategies within the model, supported by a mathematical formulation that enhances flexibility in identifying cost-effective maintenance and inspection policies. Service logistics are explicitly incorporated by triggering spare-part replenishment based on degradation thresholds rather than fixed time intervals, ensuring timely availability, minimizing components holding costs, and reducing downtime risk due to stockouts. Comparative analysis with existing approaches in the literature demonstrates significant improvements in both cost efficiency and system availability. Simulation experiments further confirm the superiority of non-periodic inspection strategies over conventional periodic policies across most operational scenarios, with periodic inspections remaining preferable only under specific conditions.
- 21 May 2025
- Published by Elsevier in Renewable Energy
- Vol. 252
Design optimization of standalone photovoltaic systems for enhanced energy density
- 21 May 2025
- Published by Elsevier in Renewable Energy
- Vol. 252
Design optimization of standalone photovoltaic systems for enhanced energy density
- 25 April 2025
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 63 (19) , 7077-7089
Optimal promise time for customer orders in imperfect discrete production systems with earliness and lateness penalties
- 25 April 2025
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 63 (19) , 7077-7089
Optimal promise time for customer orders in imperfect discrete production systems with earliness and lateness penalties
- 4 December 2023
- Published by Emerald Publishing in Journal of Quality in Maintenance Engineering
- Vol. 30 (1) , 153-174
Joint maintenance planning and production scheduling optimization model for green environment
Purpose: This research integrates maintenance planning and production scheduling from a green perspective to reduce the carbon footprint.Design/methodology/approach: A mixed-integer nonlinear programming (MINLP) model is developed to study the relation between production makespan, energy consumption, maintenance actions and footprint, i.e. service level and sustainability measures. The speed scaling technique is used to control energy consumption, the capping policy is used to control CO2 footprint and preventive maintenance (PM) is used to keep the machine working in healthy conditions.Findings: It was found that ignoring maintenance activities increases the schedule makespan by more than 21.80%, the total maintenance time required to keep the machine healthy by up to 75.33% and the CO2 footprint by 15%.Research limitations/implications: The proposed optimization model can simultaneously be used for maintenance planning, job scheduling and footprint minimization. Furthermore, it can be extended to consider other maintenance activities and production configurations, e.g. flow shop or job shop scheduling.Practical implications: Maintenance planning, production scheduling and greenhouse gas (GHG) emissions are intertwined in the industry. The proposed model enhances the performance of the maintenance and production systems. Furthermore, it shows the value of conducting maintenance activities on the machine's availability and CO2 footprint.Originality/value: This work contributes to the literature by combining maintenance planning, single-machine scheduling and environmental aspects in an integrated MINLP model. In addition, the model considers several practical features, such as machine-aging rate, speed scaling technique to control emissions, minimal repair (MR) and PM.
- 4 December 2023
- Published by Emerald Publishing in Journal of Quality in Maintenance Engineering
- Vol. 30 (1) , 153-174
Joint maintenance planning and production scheduling optimization model for green environment
Purpose: This research integrates maintenance planning and production scheduling from a green perspective to reduce the carbon footprint.Design/methodology/approach: A mixed-integer nonlinear programming (MINLP) model is developed to study the relation between production makespan, energy consumption, maintenance actions and footprint, i.e. service level and sustainability measures. The speed scaling technique is used to control energy consumption, the capping policy is used to control CO2 footprint and preventive maintenance (PM) is used to keep the machine working in healthy conditions.Findings: It was found that ignoring maintenance activities increases the schedule makespan by more than 21.80%, the total maintenance time required to keep the machine healthy by up to 75.33% and the CO2 footprint by 15%.Research limitations/implications: The proposed optimization model can simultaneously be used for maintenance planning, job scheduling and footprint minimization. Furthermore, it can be extended to consider other maintenance activities and production configurations, e.g. flow shop or job shop scheduling.Practical implications: Maintenance planning, production scheduling and greenhouse gas (GHG) emissions are intertwined in the industry. The proposed model enhances the performance of the maintenance and production systems. Furthermore, it shows the value of conducting maintenance activities on the machine's availability and CO2 footprint.Originality/value: This work contributes to the literature by combining maintenance planning, single-machine scheduling and environmental aspects in an integrated MINLP model. In addition, the model considers several practical features, such as machine-aging rate, speed scaling technique to control emissions, minimal repair (MR) and PM.
- 2 March 2023
- Published by Taylor & Francis in International Journal of Systems Science: Operations & Logistics
- Vol. 10 (1)
Discrete production workstation with two types of imperfect items: determining the optimal promise time
This paper presents a discrete production system where units are manufactured and reworked, if needed, one at a time using the same resources. Examples of these systems include products that involve extensive manual operations such as welding or manual assembly of intricate items. This industrial setting is not discussed in the literature. The major difficulty in studying these systems is the huge number of possible sequences of conforming and non-conforming units. This paper presents a very efficient approach to analyse these systems. We generate the system statistics for short production periods. In order to study the long-term behaviour of system statistics, we introduce renewal cycles. A major issue facing a manufacturer using these systems is determining the time it takes to produce a given customer order which is called promise time. This paper aims to find the optimal promise time that maximises the expected profit. Numerical experiments show that the expected profit is inversely proportional to the processing times. In addition, the expected profit is sensitive to the parameters; a change of ± 0.05 in the probability of having a conforming unit may result in a 25% change in the expected profit.
- 2 March 2023
- Published by Taylor & Francis in International Journal of Systems Science: Operations & Logistics
- Vol. 10 (1)
Discrete production workstation with two types of imperfect items: determining the optimal promise time
This paper presents a discrete production system where units are manufactured and reworked, if needed, one at a time using the same resources. Examples of these systems include products that involve extensive manual operations such as welding or manual assembly of intricate items. This industrial setting is not discussed in the literature. The major difficulty in studying these systems is the huge number of possible sequences of conforming and non-conforming units. This paper presents a very efficient approach to analyse these systems. We generate the system statistics for short production periods. In order to study the long-term behaviour of system statistics, we introduce renewal cycles. A major issue facing a manufacturer using these systems is determining the time it takes to produce a given customer order which is called promise time. This paper aims to find the optimal promise time that maximises the expected profit. Numerical experiments show that the expected profit is inversely proportional to the processing times. In addition, the expected profit is sensitive to the parameters; a change of ± 0.05 in the probability of having a conforming unit may result in a 25% change in the expected profit.
- 1 November 2021
- Published by Elsevier in Renewable Energy
- Vol. 178, 295-306
Optimization of a solar-wind- grid powered desalination system in Saudi Arabia
- 1 November 2021
- Published by Elsevier in Renewable Energy
- Vol. 178, 295-306
Optimization of a solar-wind- grid powered desalination system in Saudi Arabia