Analysis of BIM-Based Quantity Take-Off in Simplification of the Length of Processed Rebar
Open Access
- 14 February 2023
- journal article
- research article
- Published by MDPI AG in Applied Sciences
- Vol. 13 (4) , 2468
Abstract
It is important to apply the Length types of Processed Rebar Simplification (LPRS) to rebar work for improving work efficiency and reducing labor in construction fields. However, when used excessively, LPRS can also bring about adverse results, as the increase in the amount of wasted rebars can scale with the cutting process, leading to an increase in material cost. Therefore, it is crucial to find a proper level of simplification for considering labor and material cost together. In this study, various simplification tests were conducted based on BIM software to quantitatively validate the variation of the amount of rebar and LPRS according to the simplification. These tests were conducted for each member and the shape of the building, using the data of five projects, by dividing the unit of simplified rebar length into three cases. The research analysis showed that simplifying the unit of rebar lengths to 500 mm and 1000 mm increased the amounts of materials at a greater rate, making them undesirable. Further, it was recognized that irregular slabs, compared to regular slabs, more efficiently reduced the number of LPRS when adopting simplification methods. This study is expected to contribute to preventing material costs from increasing excessively by quantitatively analyzing the impact level of simplification on the amount of rebar materials and LPRS.Keywords
Funding Information
- Korea Agency for Infrastructure Technology Advancement (23ORPS-B158109-04, 23AATD-C163269-03)
This publication has 13 references indexed in Scilit:
- Improving the accuracy of BIM-based quantity takeoff for compound elementsAutomation in Construction, 2019
- Automatic Estimation System of Building Frames with Integrated Structural Design Information (AutoES)Iranian Journal of Science and Technology, Transactions of Civil Engineering, 2019
- Integrated optimization of rebar detailing design and installation planning for waste reduction and productivity improvementAutomation in Construction, 2019
- Study on BIM Family Self-create for Steel Reinforcing Bar Detail Construction Design and Information Extraction2017
- Ontology-based semantic approach for construction-oriented quantity take-off from BIM models in the light-frame building industryAdvanced Engineering Informatics, 2016
- Development of integrated design methodology for various types of product — service systemsJournal of Computational Design and Engineering, 2014
- Influence of Buildability Factors on Rebar Installation Labor Productivity of ColumnsJournal of Construction Engineering and Management, 2012
- Developing an Automatic System for Making a Placing Drawing and Quantity taking-off Cut and Bent Re Bar with Work Zone InformationJournal of the Korea Institute of Building Construction, 2008
- Improving the constructability of design solutions through an integrated systemEngineering, Construction and Architectural Management, 1996
- Constructability Concepts for Engineering and ProcurementJournal of Construction Engineering and Management, 1987