U-Yeol Park
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
U-Yeol Park has a total of 9 co-authors. Here are the top co-authors by number of shared publications:
- Chee-Kyeong Kim
Division of Architectural Engineering Dankook University 16890 Yongin Korea
1 shared publication - Heejae Ahn
School of Civil, Environmental and Architectural Engineering, Korea University, Seoul 02841, Republic of Korea
1 shared publication - Hun-Hee Cho
Senior Researcher, Institute of Construction Technology, Hyundai Engineering and Construction, 102-4 Mabuk-Dong, Giheung-Gu, Yongin-Si, Gyunggi-Do 449-716, Korea
1 shared publication - Hunhee Cho
School of Civil, Environmental and Architectural Engineering, Korea University, Seoul, Korea
1 shared publication - Hyeonmin Kim
School of Civil, Environmental, and Architectural Engineering, Korea University, 145 Anam-ro, Seongbuk-gu, Seoul 02841, Republic of Korea
1 shared publication - Kyung-In Kang
Professor, School of Civil, Environmental and Architectural Engineering, Korea Univ., Anam-Dong, Seongbuk-Gu, Seoul 136-713, Republic of Korea
1 shared publication
Latest Publications
- Open Access
- 14 February 2023
- Published by MDPI AG in Applied Sciences
- Vol. 13 (4) , 2468
Analysis of BIM-Based Quantity Take-Off in Simplification of the Length of Processed Rebar
It is important to apply the Length types of Processed Rebar Simplification (LPRS) to rebar work for improving work efficiency and reducing labor in construction fields. However, when used excessively, LPRS can also bring about adverse results, as the increase in the amount of wasted rebars can scale with the cutting process, leading to an increase in material cost. Therefore, it is crucial to find a proper level of simplification for considering labor and material cost together. In this study, various simplification tests were conducted based on BIM software to quantitatively validate the variation of the amount of rebar and LPRS according to the simplification. These tests were conducted for each member and the shape of the building, using the data of five projects, by dividing the unit of simplified rebar length into three cases. The research analysis showed that simplifying the unit of rebar lengths to 500 mm and 1000 mm increased the amounts of materials at a greater rate, making them undesirable. Further, it was recognized that irregular slabs, compared to regular slabs, more efficiently reduced the number of LPRS when adopting simplification methods. This study is expected to contribute to preventing material costs from increasing excessively by quantitatively analyzing the impact level of simplification on the amount of rebar materials and LPRS.
- 14 February 2023
- Published by MDPI AG in Applied Sciences
- Vol. 13 (4) , 2468
Open AccessAnalysis of BIM-Based Quantity Take-Off in Simplification of the Length of Processed Rebar
It is important to apply the Length types of Processed Rebar Simplification (LPRS) to rebar work for improving work efficiency and reducing labor in construction fields. However, when used excessively, LPRS can also bring about adverse results, as the increase in the amount of wasted rebars can scale with the cutting process, leading to an increase in material cost. Therefore, it is crucial to find a proper level of simplification for considering labor and material cost together. In this study, various simplification tests were conducted based on BIM software to quantitatively validate the variation of the amount of rebar and LPRS according to the simplification. These tests were conducted for each member and the shape of the building, using the data of five projects, by dividing the unit of simplified rebar length into three cases. The research analysis showed that simplifying the unit of rebar lengths to 500 mm and 1000 mm increased the amounts of materials at a greater rate, making them undesirable. Further, it was recognized that irregular slabs, compared to regular slabs, more efficiently reduced the number of LPRS when adopting simplification methods. This study is expected to contribute to preventing material costs from increasing excessively by quantitatively analyzing the impact level of simplification on the amount of rebar materials and LPRS.
- 1 July 2007
- Published by American Society of Civil Engineers (ASCE) in Journal of Computing in Civil Engineering
- Vol. 21 (4) , 259-264
Application of Support Vector Machines in Assessing Conceptual Cost Estimates
Total conceptual cost estimates and the assessment of the quality of these estimates are critical in the early stages of a building construction project. In this study, the support vector machine (SVM) model for assessing the quality of conceptual cost estimates is proposed, and the application of SVM in construction areas is investigated. The results show that the SVM model assessed the quality of conceptual cost estimates slightly more accurately than the discriminant analysis model. This shows that using the SVM has potential in construction areas. In addition, the SVM model can assist clients in their evaluation of the quality of the estimated cost and the probability of exceeding the target cost, and in their decision on whether or not it is necessary to seek a more accurate estimate in the early stages of a project.
- 1 July 2007
- Published by American Society of Civil Engineers (ASCE) in Journal of Computing in Civil Engineering
- Vol. 21 (4) , 259-264
Application of Support Vector Machines in Assessing Conceptual Cost Estimates
Total conceptual cost estimates and the assessment of the quality of these estimates are critical in the early stages of a building construction project. In this study, the support vector machine (SVM) model for assessing the quality of conceptual cost estimates is proposed, and the application of SVM in construction areas is investigated. The results show that the SVM model assessed the quality of conceptual cost estimates slightly more accurately than the discriminant analysis model. This shows that using the SVM has potential in construction areas. In addition, the SVM model can assist clients in their evaluation of the quality of the estimated cost and the probability of exceeding the target cost, and in their decision on whether or not it is necessary to seek a more accurate estimate in the early stages of a project.