Integrated Repair Shop Scheduling and Spare Parts Pooling for Robust Product Regeneration
- 13 December 2021
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 200-206
Abstract
The regeneration of complex capital goods is subject to significant information uncertainty with regard to the capacity and material demand to be expected from a regeneration order. One suitable measure to prevent losses in capacity utilization or delays caused by missing material supply is pooling of spare parts over several pool stages. In order to make optimal use of the mostly scarcely available pool components (due to their high price) in terms of increasing the robustness of the logistics processes, material management and production planning and control (PPC) require close coordination. This paper presents an approach to integrate multi-stage spare parts pooling and repair shop scheduling for the regeneration of complex capital goods using mathematical modeling. In addition to various logistics interdependencies, this approach also takes into account typical uncertainties and dynamics drivers in regeneration. Finally, the logistics potential of this approach is demonstrated by integrating it into an event-driven, rolling planning approach and its application to an exemplary use case.Keywords
Funding Information
- Deutsche Forschungsgemeinschaft
This publication has 28 references indexed in Scilit:
- Validation of data fusion as a method for forecasting the regeneration workload for complex capital goodsProduction Engineering, 2013
- Determination of the Spare Parts Demand for Maintenance, Repair and Overhaul Service Providers2013
- Cooperative strategies for the availability service of repairable aircraft componentsInternational Journal of Production Economics, 2009
- Multi-item spare parts systems with lateral transshipments and waiting time constraintsEuropean Journal of Operational Research, 2006
- Pooling of spare components between airlinesJournal of Air Transport Management, 2004
- Leadtime effects and policy improvement for stochastic inventory control with remanufacturingInternational Journal of Production Economics, 2001
- Controlling production dynamics - managing uncertainties with automatic production controlInternational Journal of Production Research, 2000
- Production planning and control for remanufacturing: industry practice and research needsJournal of Operations Management, 2000
- Scheduling policies for remanufacturingInternational Journal of Production Economics, 1997
- Robustness and Optimality as Criteria for Strategic DecisionsJournal of the Operational Research Society, 1972