Torben Lucht
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Torben Lucht has a total of 5 co-authors. Here are the top co-authors by number of shared publications:
- Alexander Mütze
Leibniz University Hannover
2 shared publications - Peter Nyhuis
Institute of Production Systems and Logistics, Leibniz University Hannover, Garbsen, Germany
2 shared publications A. Wojcik
Institute of Production Systems and Logistics (IFA), Leibniz University, Hannover, Germany
1 shared publicationPeter Nyhuis
Institute of Production Systems and Logistics, Leibniz University Hannover, Garbsen, Germany
1 shared publication- Tim Kampfer
Leibniz Universität Hannover
1 shared publication
Latest Publications
- Open Access
- 26 January 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 10, 20328-20344
Logistics-Oriented Production Configuration Using the Example of MRO Service Providers
Providers of maintenance, repair and overhaul (MRO) services for complex capital goods, such as aircraft engines, which are indispensable for the customers to perform their services, are facing increasing market dynamics as well as constantly growing, diversifying customer requirements. The ability to achieve (the required) high logistics performance is greatly determined by a suitable production configuration. From the strategic definition of goals to the design of suitable supply chain structures as well as planning, controlling and monitoring mechanisms, a multitude of interdependent configuration decisions must be made on different organisational levels at various points in time. At the same time, numerous internal and external influencing variables must be taken into account, observed and continuously examined for configuration-relevant changes. If necessary, suitable reconfiguration measures must be initiated. This article presents an approach to production configuration based on logistics modelling. To handle the multitude of effects and interactions they are translated into a framework for efficient and sustainable production configuration. It consists of four successive levels for the initial configuration as well as an additional module for long-term production configuration monitoring. It serves to review pre-existing configurations in the context of reorganisation projects and enables the target-oriented configuration of internal supply chains.
- 26 January 2022
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 10, 20328-20344
Open AccessLogistics-Oriented Production Configuration Using the Example of MRO Service Providers
Providers of maintenance, repair and overhaul (MRO) services for complex capital goods, such as aircraft engines, which are indispensable for the customers to perform their services, are facing increasing market dynamics as well as constantly growing, diversifying customer requirements. The ability to achieve (the required) high logistics performance is greatly determined by a suitable production configuration. From the strategic definition of goals to the design of suitable supply chain structures as well as planning, controlling and monitoring mechanisms, a multitude of interdependent configuration decisions must be made on different organisational levels at various points in time. At the same time, numerous internal and external influencing variables must be taken into account, observed and continuously examined for configuration-relevant changes. If necessary, suitable reconfiguration measures must be initiated. This article presents an approach to production configuration based on logistics modelling. To handle the multitude of effects and interactions they are translated into a framework for efficient and sustainable production configuration. It consists of four successive levels for the initial configuration as well as an additional module for long-term production configuration monitoring. It serves to review pre-existing configurations in the context of reorganisation projects and enables the target-oriented configuration of internal supply chains.
- 13 December 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 200-206
Integrated Repair Shop Scheduling and Spare Parts Pooling for Robust Product Regeneration
The regeneration of complex capital goods is subject to significant information uncertainty with regard to the capacity and material demand to be expected from a regeneration order. One suitable measure to prevent losses in capacity utilization or delays caused by missing material supply is pooling of spare parts over several pool stages. In order to make optimal use of the mostly scarcely available pool components (due to their high price) in terms of increasing the robustness of the logistics processes, material management and production planning and control (PPC) require close coordination. This paper presents an approach to integrate multi-stage spare parts pooling and repair shop scheduling for the regeneration of complex capital goods using mathematical modeling. In addition to various logistics interdependencies, this approach also takes into account typical uncertainties and dynamics drivers in regeneration. Finally, the logistics potential of this approach is demonstrated by integrating it into an event-driven, rolling planning approach and its application to an exemplary use case.
- 13 December 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 200-206
Integrated Repair Shop Scheduling and Spare Parts Pooling for Robust Product Regeneration
The regeneration of complex capital goods is subject to significant information uncertainty with regard to the capacity and material demand to be expected from a regeneration order. One suitable measure to prevent losses in capacity utilization or delays caused by missing material supply is pooling of spare parts over several pool stages. In order to make optimal use of the mostly scarcely available pool components (due to their high price) in terms of increasing the robustness of the logistics processes, material management and production planning and control (PPC) require close coordination. This paper presents an approach to integrate multi-stage spare parts pooling and repair shop scheduling for the regeneration of complex capital goods using mathematical modeling. In addition to various logistics interdependencies, this approach also takes into account typical uncertainties and dynamics drivers in regeneration. Finally, the logistics potential of this approach is demonstrated by integrating it into an event-driven, rolling planning approach and its application to an exemplary use case.
- Open Access
- 13 August 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 9, 115077-115089
Model-Based Approach for Assessing Planning Quality in Production Logistics
For manufacturing companies, reliable production planning and scheduling not only is the basis for efficient order processing but at the same time is an essential prerequisite for the integration and coordination of all participants along the entire supply chain. At the same time, the increasing delegation of planning activities to dynamic software solutions leads to increasing intransparency regarding the planning behavior. It thus becomes increasingly difficult to identify and address inefficiencies or problems caused by the planning processes within industrial supply chains. This paper presents an easy-to-use method for describing, visualizing and analyzing scheduling behavior in manufacturing companies requiring only very few data. In addition, an overview of key planning quality indicators (KPQIs) to be considered in the evaluation of the planning quality is given and structured along the assessment dimensions of plan stability and planning accuracy. The specific application at a maintenance, repair and overhaul (MRO) service provider for complex capital goods demonstrates the benefits and insights to be gained from the model’s application, especially in highly dynamic market environments. Using machine learning, characteristic planning patterns can also be statistically determined with the developed description logic and KPQI system.
- 13 August 2021
- Published by Institute of Electrical and Electronics Engineers (IEEE) in IEEE Access
- Vol. 9, 115077-115089
Open AccessModel-Based Approach for Assessing Planning Quality in Production Logistics
For manufacturing companies, reliable production planning and scheduling not only is the basis for efficient order processing but at the same time is an essential prerequisite for the integration and coordination of all participants along the entire supply chain. At the same time, the increasing delegation of planning activities to dynamic software solutions leads to increasing intransparency regarding the planning behavior. It thus becomes increasingly difficult to identify and address inefficiencies or problems caused by the planning processes within industrial supply chains. This paper presents an easy-to-use method for describing, visualizing and analyzing scheduling behavior in manufacturing companies requiring only very few data. In addition, an overview of key planning quality indicators (KPQIs) to be considered in the evaluation of the planning quality is given and structured along the assessment dimensions of plan stability and planning accuracy. The specific application at a maintenance, repair and overhaul (MRO) service provider for complex capital goods demonstrates the benefits and insights to be gained from the model’s application, especially in highly dynamic market environments. Using machine learning, characteristic planning patterns can also be statistically determined with the developed description logic and KPQI system.