A job-splitting heuristic for lot-size scheduling in multi-stage, multi-product production processes
Author:
- M.K. El-NajdawiMEM.K. El-Najdawi
- 1 June 1994
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 75 (2) , 365-377
Abstract
No abstract availableKeywords
Funding Information
- Villanova University
This publication has 17 references indexed in Scilit:
- Common Cycle Lot-Size Scheduling for Multi-Product, Multi-Stage ProductionManagement Science, 1993
- A compact heuristic for common cycle lot-size scheduling in multi-stage, multi-product production processesInternational Journal of Production Economics, 1992
- Two heuristics for the economic lot scheduling problem: An experimental studyNaval Research Logistics (NRL), 1988
- The Economic Lot-Scheduling Problem: Achieving Feasibility Using Time-Varying Lot SizesOperations Research, 1987
- The Two-Product, Single-Machine, Static Demand, Infinite Horizon Lot Scheduling ProblemManagement Science, 1982
- The Economic Lot Scheduling Problem (ELSP): Review and ExtensionsManagement Science, 1978
- Lot Sizing and Sequencing for N Products on One FacilityManagement Science, 1977
- An Iterative Procedure for the Single-Machine Multi-Product Lot Scheduling ProblemManagement Science, 1973
- Scheduling a Multi-Product Single Machine SystemJournal of the Operational Research Society, 1973
- Economic Lot Size Determination in Multi-Stage Assembly SystemsManagement Science, 1973