The impact of fleet electrification on productivity in heat-constrained underground mines
Authors:
- 15 July 2025
- journal article
- Published by Elsevier in Journal of Cleaner Production
- Vol. 520
Abstract
No abstract availableFunding Information
- National Institute for Occupational Safety and Health (0000HCCS-2019-36404)
This publication has 40 references indexed in Scilit:
- Optimizing ventilation in medium- and short-term mine planningOptimization and Engineering, 2024
- Optimal sizing and dispatch of solar power with storageOptimization and Engineering, 2023
- Underground production scheduling with ventilation and refrigeration considerationsOptimization and Engineering, 2022
- Optimizing design and dispatch of a renewable energy systemApplied Energy, 2021
- A study of the Bienstock–Zuckerberg algorithm: applications in mining and resource constrained project schedulingComputational Optimization and Applications, 2017
- A preemptive bound for the Resource Constrained Project Scheduling ProblemJournal of Scheduling, 2013
- Tailored Lagrangian Relaxation for the open pit block sequencing problemAnnals of Operations Research, 2013
- The new Fundamental Tree Algorithm for production scheduling of open pit minesEuropean Journal of Operational Research, 2007
- Using aggregation to optimize long-term production planning at an underground mineEuropean Journal of Operational Research, 2007
- An enumeration algorithm for solving the fleet management problem in underground minesComputers & Operations Research, 2006