On the exact solution of the no-wait flow shop problem with due date constraints
Authors:
- Hamed SamarghandiHSHamed Samarghandi
- Mehdi BehrooziMBMehdi Behroozi
- 1 May 2017
- journal article
- Published by Elsevier in Computers & Operations Research
- Vol. 81, 141-159
Abstract
No abstract availableKeywords
This publication has 51 references indexed in Scilit:
- Solving the single-machine sequencing problem using integer programmingComputers & Industrial Engineering, 2010
- Mixed integer programming formulations for single machine scheduling problemsComputers & Industrial Engineering, 2009
- A study of integer programming formulations for scheduling problemsInternational Journal of Systems Science, 1997
- A comparative analysis of due date based job sequencing rules in a flow shop with multiple processorsProduction Planning & Control, 1996
- Minimizing the sum of absolute deviations about a common due date for the two-machine flow shop problemApplied Mathematical Modelling, 1995
- Exact Solution of Large Asymmetric Traveling Salesman ProblemsScience, 1991
- Improvements and extensions to the Miller-Tucker-Zemlin subtour elimination constraintsOperations Research Letters, 1991
- Alternative Formulations of a Flow-shop Scheduling ProblemJournal of the Operational Research Society, 1989
- On the Development of a Mixed-Integer Linear Programming Model for the Flowshop Sequencing ProblemJournal of the Operational Research Society, 1988
- A Mixed-Integer Goal-Programming Formulation of the Standard Flow-Shop Scheduling ProblemJournal of the Operational Research Society, 1986