Evaluating Design Rainstorm Durations for Urban Flood Control
Authors:
- Kwan Tun LeeKwan Tun Lee
- Ta-Chun ChienTCTa-Chun Chien
- Wang-Sheng YuWYWang-Sheng Yu
- Nai-Kuang ChenNCNai-Kuang Chen
- Pin-Chun HuangPHPin-Chun Huang
- Yi-Ting LinYLYi-Ting Lin
- Yu-Han HsuYHYu-Han Hsu
- Yu-Hsun LiaoYLYu-Hsun Liao
- Huan-Yuan ChenHCHuan-Yuan Chen
- Ching-Wen HsuCHChing-Wen Hsu
- Jing Zong YangJYJing Zong Yang
- Ciao-Ru LiCLCiao-Ru Li
Open Access
Abstract
In conventional hydrology, a short-duration design rainstorm is typically used to estimate the design discharge in urban sewer systems. The reason for using a short duration is that engineers believe the time of concentration in urban watersheds is relatively small. The short-duration hyetograph is supposed to generate a flow hydrograph that accurately reflects the rainfall-runoff processes. In this study, we developed a street-sewer runoff model for an urban district of 2470 hectares. Detailed field flooding records were utilized to verify the stormwater model’s capability for inundation simulations. Subsequently, different rainfall series extracted from the recorded rainstorm data were used to investigate the causes of flooding corresponding to different durations of rainstorms. The results indicate that a 90 min main concentrated rainstorm causes small-scale flooding only; however, a 24 h rainfall series results in an extensive range of inundations. We further conducted similar short- and long-duration hyetograph tests in 16 urban drainage partitions (ranging from 2.3 to 193.5 hectares) to confirm the above findings. The results indicate that the maximum discharge in most partitions can only be found when the hyetograph duration exceeds 1080 min, which essentially contradicts previous engineering designs in urban watersheds in Taiwan.Keywords
Funding Information
- National Land Management Agency, Ministry of the Interior, Taiwan (111H50213)
This publication has 19 references indexed in Scilit:
- Identifying Risk Components Using a Sewer-Road Integrated Urban Stormwater ModelWater Resources Management, 2024
- Relationship Between Rainfall Duration and Sewer System Performance Measures Within the Context of UncertaintyWater Resources Management, 2021
- A simple procedure for design flood estimation incorporating duration and return period of design rainfallArabian Journal of Geosciences, 2021
- Design Hyetograph for Typhoon Rainstorms in TaiwanJournal of Hydrologic Engineering, 2008
- A simulation experiment for optimal design hyetograph selectionHydrological Processes, 2007
- Assessment of Storm Duration for Hydrologic DesignJournal of Hydrologic Engineering, 1999
- Critical rainfall duration for overland flow from an infiltrating plane surfaceJournal of Hydrology, 1997
- Estimating Urban Time of ConcentrationJournal of Hydraulic Engineering, 1984
- Critical duration of rainfall for flood estimationWater Resources Research, 1976
- Time distribution of rainfall in heavy stormsWater Resources Research, 1967