Ciao-Ru Li
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Ciao-Ru Li has a total of 20 co-authors. Here are the top co-authors by number of shared publications:
- Ching-Wen Hsu
Geographic Information Research Center, National Taiwan Ocean University, Keelung 202301, Taiwan
2 shared publications - Cho-Min Yang
Geographic Information Research Center, National Taiwan Ocean University, Keelung 202301, Taiwan
2 shared publications - Kwan Tun Lee
Department of River and Harbor Engineering, National Taiwan Ocean University, Keelung 202, Taiwan
2 shared publications - Nai-Kuang Chen
Geographic Information Research Center, National Taiwan Ocean University, Keelung 202301, Taiwan
2 shared publications - Ta-Chun Chien
Department of River and Harbor Engineering, National Taiwan Ocean University, Keelung 202301, Taiwan
2 shared publications - Yi-Ting Lin
Geographic Information Research Center, National Taiwan Ocean University, Keelung 202301, Taiwan
2 shared publications
Latest Publications
- Open Access
Development of Integrated Geomorphological and Hydrological GIS Platform for Prospective Dam Site Analysis
Constructing new reservoirs to ensure a reliable water supply in downstream areas and to alleviate overflow flooding along rivers during floods is an urgent task for the authorities. In this study, we developed a GIS platform that integrates a series of watershed geomorphological and hydrological models to assess the suitability of prospective dam sites. The built-in modules include watershed geomorphological analysis, rainfall analysis, flow analysis, surplus water analysis, and reservoir analysis. Using the digital elevation model, users can obtain the reservoir H-A-V curve at a prospective dam site and the upstream watershed’s geomorphological factors. A topography-based hydrological model was used to estimate available water at the dam site, and surplus water was obtained by subtracting existing water demands and/or environmental flow requirements from the available water series. Exceedance probability analysis was then conducted for the surplus water to evaluate the dam site’s feasibility for new water resources development. The system also provides a reservoir’s useful-life evaluation to determine the time required for sediment accumulation to render the reservoir unable to serve its intended purpose. Moreover, for flood control, the platform includes a built-in module for estimating design discharge for different return periods. The planned Pingxi Reservoir site in New Taipei County, Taiwan, is used as an example in this study. Detailed analytical procedures are presented to demonstrate the use of the proposed integrated GIS platform system to assess the adequacy of prospective dam sites for new water resources development.
Open AccessDevelopment of Integrated Geomorphological and Hydrological GIS Platform for Prospective Dam Site Analysis
Constructing new reservoirs to ensure a reliable water supply in downstream areas and to alleviate overflow flooding along rivers during floods is an urgent task for the authorities. In this study, we developed a GIS platform that integrates a series of watershed geomorphological and hydrological models to assess the suitability of prospective dam sites. The built-in modules include watershed geomorphological analysis, rainfall analysis, flow analysis, surplus water analysis, and reservoir analysis. Using the digital elevation model, users can obtain the reservoir H-A-V curve at a prospective dam site and the upstream watershed’s geomorphological factors. A topography-based hydrological model was used to estimate available water at the dam site, and surplus water was obtained by subtracting existing water demands and/or environmental flow requirements from the available water series. Exceedance probability analysis was then conducted for the surplus water to evaluate the dam site’s feasibility for new water resources development. The system also provides a reservoir’s useful-life evaluation to determine the time required for sediment accumulation to render the reservoir unable to serve its intended purpose. Moreover, for flood control, the platform includes a built-in module for estimating design discharge for different return periods. The planned Pingxi Reservoir site in New Taipei County, Taiwan, is used as an example in this study. Detailed analytical procedures are presented to demonstrate the use of the proposed integrated GIS platform system to assess the adequacy of prospective dam sites for new water resources development.
- Open Access
Evaluating Design Rainstorm Durations for Urban Flood Control
In conventional hydrology, a short-duration design rainstorm is typically used to estimate the design discharge in urban sewer systems. The reason for using a short duration is that engineers believe the time of concentration in urban watersheds is relatively small. The short-duration hyetograph is supposed to generate a flow hydrograph that accurately reflects the rainfall-runoff processes. In this study, we developed a street-sewer runoff model for an urban district of 2470 hectares. Detailed field flooding records were utilized to verify the stormwater model’s capability for inundation simulations. Subsequently, different rainfall series extracted from the recorded rainstorm data were used to investigate the causes of flooding corresponding to different durations of rainstorms. The results indicate that a 90 min main concentrated rainstorm causes small-scale flooding only; however, a 24 h rainfall series results in an extensive range of inundations. We further conducted similar short- and long-duration hyetograph tests in 16 urban drainage partitions (ranging from 2.3 to 193.5 hectares) to confirm the above findings. The results indicate that the maximum discharge in most partitions can only be found when the hyetograph duration exceeds 1080 min, which essentially contradicts previous engineering designs in urban watersheds in Taiwan.
Open AccessEvaluating Design Rainstorm Durations for Urban Flood Control
In conventional hydrology, a short-duration design rainstorm is typically used to estimate the design discharge in urban sewer systems. The reason for using a short duration is that engineers believe the time of concentration in urban watersheds is relatively small. The short-duration hyetograph is supposed to generate a flow hydrograph that accurately reflects the rainfall-runoff processes. In this study, we developed a street-sewer runoff model for an urban district of 2470 hectares. Detailed field flooding records were utilized to verify the stormwater model’s capability for inundation simulations. Subsequently, different rainfall series extracted from the recorded rainstorm data were used to investigate the causes of flooding corresponding to different durations of rainstorms. The results indicate that a 90 min main concentrated rainstorm causes small-scale flooding only; however, a 24 h rainfall series results in an extensive range of inundations. We further conducted similar short- and long-duration hyetograph tests in 16 urban drainage partitions (ranging from 2.3 to 193.5 hectares) to confirm the above findings. The results indicate that the maximum discharge in most partitions can only be found when the hyetograph duration exceeds 1080 min, which essentially contradicts previous engineering designs in urban watersheds in Taiwan.