Forecasting the Final Contract Cost on the Basis of the Owner’s Cost Estimation Using an Artificial Neural Network
Open Access
Abstract
Raising the final contract cost (FCC) is a significant risk for project owners. This study hypothesizes that the factors that cause owner’s cost estimation (OCE) accuracy and FCC changes share the same causes, and a case study confirmed that the two variables (OCE and FCC) could be correlated. Accordingly, this study aims to develop a forecast model to predict FCC on the basis of the initial OCE, which has not been studied previously. This study utilized data from 34 Saudi Arabian projects. Two linear regression models developed the data, and the square root function transformed the data. Moreover, the artificial neural network (ANN) model was developed after data standardization using Zavadskas and Turskis’ logarithmic method. The results showed that the ANN model had a MAPE smaller than the two linear regression models. Using Zavadskas and Turskis’ logarithmic standardization method and elimination of data that had an absolute percentage error (APE) of more than 35% led to an increase in ANN model accuracy and provided a MAPE value of less than 8.5%.Keywords
Funding Information
- The Deputyship for Research & Innovation, Ministry of Education in Saudi Arabia (IFKSURG-2- IFKSURG-2)
This publication has 36 references indexed in Scilit:
- Combination of Project Cost Forecasts in Earned Value ManagementJournal of Construction Engineering and Management, 2011
- Causes, Effects, Benefits, and Remedies of Change Orders on Public Construction Projects in OmanJournal of Construction Engineering and Management, 2010
- Variations and Change Orders on Construction ProjectsJournal of Legal Affairs and Dispute Resolution in Engineering and Construction, 2010
- Correlating Bid Price with the Number of Bidders and Final Construction Cost of Public Street ProjectsTransportation Research Record: Journal of the Transportation Research Board, 2010
- Analysis of the Impacts of the Number of Bidders Upon Bid ValuesPublic Works Management & Policy, 2008
- Predicting Construction Cost Using Multiple Regression TechniquesJournal of Construction Engineering and Management, 2006
- Investigation of Bid Price Competition Measured through Prebid Project Estimates, Actual Bid Prices, and Number of BiddersJournal of Construction Engineering and Management, 2005
- An integrated regression analysis and time series model for construction tender price index forecastingConstruction Management and Economics, 2004
- Forecast models for actual construction time and costBuilding and Environment, 2003
- A theoretical framework for determining the minimum number of bidders in construction bidding competitionsConstruction Management and Economics, 2002