A comparison allocation of labor qualification on real, plan, and regulation calculation using resource-leveling method
Open Access
- 26 June 2025
- journal article
- Published by Universitas Serang Raya in Jurnal Sistem dan Manajemen Industri
- Vol. 9 (1) , 1-13
Abstract
Labor is a crucial resource in industrial construction projects. A common issue is the uneven number of laborers who are overallocated. This study uses the resource-leveling method to compare and determine the optimal number of labor and project duration based on plan, real, and regulation conditions. In this study, the data required in real conditions is obtained from daily report data. In planned conditions, data is obtained from the scheduled manpower made by the contractor, while in conditions based on regulations, the calculation of the number of laborers uses the coefficient values listed in the Regulation of the Minister of Public Works and Public Housing No. 1 of 2022. This research is measured through disparity values, which show an imbalance in the allocation of labor caused by the uneven allocation of labor based on its workload. The results showed a significant difference in the number and distribution of labor. Regulation conditions resulted in higher labor numbers due to detailed calculations on each type of work and labor qualifications. The highest disparity occurs in workers, with a value of 0.93 in the plan condition and -0.51 in the regulation condition. The resource leveling helped balance labor allocation but increased project duration from 98 to 112 working days. These findings provide practical insights for project managers to optimize worker planning and distribution, improve efficiency, and reduce overallocated risks.Keywords
This publication has 26 references indexed in Scilit:
- Use of float consumption rate in resource leveling of construction projectsFrontiers of Engineering Management, 2020
- Resource levelling problem in construction projects under neutrosophic environmentThe Journal of Supercomputing, 2019
- Genetic algorithm based optimization for resource leveling problem with precedence constrained schedulingInternational Journal of Construction Management, 2019
- Resource leveling in construction projects with activity splitting and resource constraints: a simulated annealing optimizationCanadian Journal of Civil Engineering, 2019
- Multi-mode resource leveling in projects with mode-dependent generalized precedence relationsExpert Systems with Applications, 2018
- Sustainable project management through project control in infrastructure projectsInternational Journal of Project Management, 2017
- Project resources scheduling and leveling using Multi-Attribute Decision Models: Models implementation and case studyExpert Systems with Applications, 2017
- Optimizing Multiple-Resources Leveling in Multiple Projects Using Discrete Symbiotic Organisms SearchJournal of Computing in Civil Engineering, 2016
- Multiobjective model for solving resource‐leveling problem with discounted cash flowsInternational Transactions in Operational Research, 2016
- A Cost Optimization Model for Multiresource Leveling Problem without Project Duration ConstraintDiscrete Dynamics in Nature and Society, 2016