Prediction of BlastInduced Ground Vibration (BIGV) of Metro Construction Using Difference Evolution AlgorithmOptimized Gaussian Process (DE‐GP)
Open Access
- 1 January 2021
- journal article
- research article
- Published by Wiley in Shock and Vibration
- Vol. 2021 (1)
Abstract
Rock blasting often has an irreversible impact on the surrounding environment and threatens the safety of life and property. Therefore, accurate prediction of blast‐induced ground vibration (BIGV) is a prerequisite for safe construction. In view of the fact that traditional blasting peak particle velocity (PPV) empirical formulas cannot be accurately predicted, this study selected 88 sets of blasting monitoring data, based on distance from the blast‐face, maximum charge per delay, total charge, hole depth, spacing, burden, stemming length, and powder factor being used as input variables and PPV being used as output variable to characterize BIGV. First, a nonlinear mapping relationship between input variables and output variable is established through the Gaussian process (GP). The differential evolution algorithm (DE) is used to optimize the hyperparameters σf, σn, and l of the GP, and a blasting PPV model based on the DE‐GP is constructed. The proposed model is compared with the empirical formulas, least square support vector machine (LSSVM), artificial neural network (ANN), and GP model, and its prediction performance is evaluated by statistical indicators such as root mean square error (RMSE). Finally, the cosine amplitude method (CAM) is used to analyze the sensitivity of blasting parameters. The results show that the DE‐GP algorithm for blasting vibration velocity prediction has higher precision and accuracy, which is significantly better than other models, and is the closest to the measured PPV. Distance from the blast‐face, total charge, and maximum charge per delay have a greater impact on the prediction of PPV, while stemming length and powder factor have a smaller impact on the prediction of PPV. The DE‐GP model proposed by this research has certain reference value for the prediction and control of PPV in blasting construction.Keywords
Funding Information
- National Natural Science Foundation of China (52078093, 51678101)
- Central University Basic Research Fund of China (3132014326)
- Liaoning Revitalization Talents Program (XLYC1905015)
This publication has 31 references indexed in Scilit:
- A new hybrid ANFIS–PSO model for prediction of peak particle velocity due to bench blastingEngineering with Computers, 2016
- Development and Application of Blast Casting Technique in Large-Scale Surface Mines: A Case Study of Heidaigou Surface Coal Mine in ChinaShock and Vibration, 2016
- A Gaussian process-based response surface method for structural reliability analysisSTRUCTURAL ENGINEERING AND MECHANICS, 2015
- Feasibility of indirect determination of blast induced ground vibration based on support vector machineMeasurement, 2015
- Feasibility of ANFIS model for prediction of ground vibrations resulting from quarry blastingEnvironmental Earth Sciences, 2015
- Prediction and optimization of back-break and rock fragmentation using an artificial neural network and a bee colony algorithmBulletin of Engineering Geology and the Environment, 2015
- Ground vibration prediction in quarry blasting through an artificial neural network optimized by imperialist competitive algorithmBulletin of Engineering Geology and the Environment, 2014
- A Dimensional Analysis Approach to Study Blast-Induced Ground VibrationRock Mechanics and Rock Engineering, 2014
- Development of a fuzzy model for predicting ground vibration caused by rock blasting in surface miningJournal of Vibration and Control, 2012
- Putting ground vibration predictions into practiceInternational Journal of Rock Mechanics and Mining Sciences, 1993