A Case Study on Black Start Capability Assessment
Authors:
- 1 November 2019
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-5
Abstract
Despite the fact that tremendous efforts have been placed to avoid outages on power system networks, forced outages can occur as a result of catastrophic event, device error, operator fault and cyber threats. These outages, when occur, can lead to partial or complete blackout. The effects of the blackout are national safety, financial losses, system reliability reduction, and threaten personnel. To minimise such impacts of the blackouts, it is essential to utilise the available black-start units to restore power system to normal condition with minimum restoration time. In this paper a black start modelling and simulation study is accomplished, using real data from Benghazi North Power Plant (BNPP), to validate the feasibility of a black start plan in terms of both steady state and transient operating conditions. It is found that selection of the optimum size of the black start depends on the capacity of the largest motor during starting, the capacitive charging reactance of the connected cable or transmission line as well as the size and vector group of the transformers.Keywords
This publication has 8 references indexed in Scilit:
- A Survey on Power System Blackout and Cascading Events: Research Motivations and ChallengesEnergies, 2019
- Optimal Black Start Allocation for Power System RestorationIEEE Transactions on Power Systems, 2018
- Power system restoration: a literature review from 2006 to 2016Journal of Modern Power Systems and Clean Energy, 2016
- Grid restoration planning after a total blackout2015
- Generation system reliability evaluation based on convolution algorithm and data modeling2015
- Optimal Black Start Resource AllocationIEEE Transactions on Power Systems, 2015
- Black start capability assessment in power system restoration2011
- Black start studies for system restoration2008