Design of 100 MW LNG Floating Barge Power Plant
Open Access
- 15 June 2017
- journal article
- Published by Lembaga Penelitian dan Pengabdian kepada Masyarakat ITS in International Journal of Marine Engineering Innovation and Research
- Vol. 1 (3)
Abstract
Floating bargepower plant able to supply amount of electricity to undeveloped island in Indonesia. In this research , the generator will be use in the power plant is dual-fuel engine. The process was determine the engine and every equipment along with its configuration then arrange the equipment. The result, MAN18V51/60DF selected along with its system configuration and its general arrangement. The final design enable 7.06 days of operation with daily average load (64.76 MW) or 4.57 days with continues 100 MW load. In the end, the mobile power plant can be built on Damen B32SPo9832 Barge and comply with the regulationfloating bargepower plant able to supply amount of electricity to undeveloped island in Indonesia. In this research , the generator will be use in the power plant is dual-fuel engine. The process was determine the engine and every equipment along with its configuration then arrange the equipment. The result, MAN18V51/60DF selected along with its system configuration and its general arrangement. The final design enable 7.06 days of operation with daily average load (64.76 MW) or 4.57 days with continues 100 MW load. In the end, the mobile power plant can be built on Damen B32SPo9832 Barge and comply with the regulationKeywords
This publication has 1 reference indexed in Scilit:
- Horizontal Pendulum Performance Analysis with Multilevel Model Plate on Ocean Wave Electric Power Plant (PLTGL)International Journal of Marine Engineering Innovation and Research, 2017