Hari Prastowo
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Research Subjects
Hari Prastowo has a total of 11 co-authors. Here are the top co-authors by number of shared publications:
- Dwi Priyanta
Institut Teknologi Sepuluh Nopember
2 shared publications - Muhammad Badrus Zaman
Institut Teknologi Sepuluh Nopember (ITS)
2 shared publications - Nurhadi Siswantoro
Institut Teknologi Sepuluh Nopember
2 shared publications - Trika Pitana
Institut Teknologi Sepuluh Nopember
2 shared publications - Aldio Paruna
Department of Marine Engineering, Institut Teknologi Sepuluh Nopember, Surabaya, 60111, Indonesia
1 shared publication - Dian Prasetyawati
Universitas Muhammadiyah Surabaya
1 shared publication
Latest Publications
- 2 January 2026
- Published by Springer Nature
- p. 49-58
Development of Port Area Obstacles and Animations in a Virtual Reality-Based Ship Simulator to Enhance User Experience
- 2 January 2026
- Published by Springer Nature
- p. 49-58
Development of Port Area Obstacles and Animations in a Virtual Reality-Based Ship Simulator to Enhance User Experience
- 22 September 2024
- Published by Springer Nature
- p. 75-82
Digital Twin Monitoring System for Diesel Engine Based on Arduino, Case Study: RPM and Exhaust Gas Temperature
- 22 September 2024
- Published by Springer Nature
- p. 75-82
Digital Twin Monitoring System for Diesel Engine Based on Arduino, Case Study: RPM and Exhaust Gas Temperature
- Open Access
- 15 June 2017
- Published by Lembaga Penelitian dan Pengabdian kepada Masyarakat ITS in International Journal of Marine Engineering Innovation and Research
- Vol. 1 (3)
Design of 100 MW LNG Floating Barge Power Plant
Floating bargepower plant able to supply amount of electricity to undeveloped island in Indonesia. In this research , the generator will be use in the power plant is dual-fuel engine. The process was determine the engine and every equipment along with its configuration then arrange the equipment. The result, MAN18V51/60DF selected along with its system configuration and its general arrangement. The final design enable 7.06 days of operation with daily average load (64.76 MW) or 4.57 days with continues 100 MW load. In the end, the mobile power plant can be built on Damen B32SPo9832 Barge and comply with the regulationfloating bargepower plant able to supply amount of electricity to undeveloped island in Indonesia. In this research , the generator will be use in the power plant is dual-fuel engine. The process was determine the engine and every equipment along with its configuration then arrange the equipment. The result, MAN18V51/60DF selected along with its system configuration and its general arrangement. The final design enable 7.06 days of operation with daily average load (64.76 MW) or 4.57 days with continues 100 MW load. In the end, the mobile power plant can be built on Damen B32SPo9832 Barge and comply with the regulation
- 15 June 2017
- Published by Lembaga Penelitian dan Pengabdian kepada Masyarakat ITS in International Journal of Marine Engineering Innovation and Research
- Vol. 1 (3)
Open AccessDesign of 100 MW LNG Floating Barge Power Plant
Floating bargepower plant able to supply amount of electricity to undeveloped island in Indonesia. In this research , the generator will be use in the power plant is dual-fuel engine. The process was determine the engine and every equipment along with its configuration then arrange the equipment. The result, MAN18V51/60DF selected along with its system configuration and its general arrangement. The final design enable 7.06 days of operation with daily average load (64.76 MW) or 4.57 days with continues 100 MW load. In the end, the mobile power plant can be built on Damen B32SPo9832 Barge and comply with the regulationfloating bargepower plant able to supply amount of electricity to undeveloped island in Indonesia. In this research , the generator will be use in the power plant is dual-fuel engine. The process was determine the engine and every equipment along with its configuration then arrange the equipment. The result, MAN18V51/60DF selected along with its system configuration and its general arrangement. The final design enable 7.06 days of operation with daily average load (64.76 MW) or 4.57 days with continues 100 MW load. In the end, the mobile power plant can be built on Damen B32SPo9832 Barge and comply with the regulation