An optimization model to solve the resource constrained project scheduling problem RCPSP in new product development projects•
Open Access
- 1 January 2020
- journal article
- research article
- Published by Universidad Nacional de Colombia in DYNA
- Vol. 87 (212) , 179-188
Abstract
New product development projects (NPDP) face different risks that may affect the scheduling. In this article, the purpose was to develop an optimization model to solve the RCPSP in NPDP and obtain a robust baseline for the project. The proposed model includes three stages: the identification of the project’s risks, an estimation of activities’ duration, and the resolution of an integer linear program. Two versions of the model were designed and compared in order to select the best one. The first version uses a method to estimate the activities’ duration based on the expected value of the impact of the risks and the second version uses a method based on the judgmental risk analysis process. Finally, the two version of the model were applied to a case study and the best version of the model was identified using a robustness indicator that analyses the start times of the baselines generated.Keywords
This publication has 42 references indexed in Scilit:
- The project scheduling problem with non-deterministic activities duration: A literature reviewJournal of Industrial Engineering and Management, 2018
- A bi-objective model for robust resource-constrained project scheduling problem with random activity durations2015
- Proactive project scheduling in an R&D department a bi-objective genetic algorithm2015
- A Knowledge-Based Evolutionary Multiobjective Approach for Stochastic Extended Resource Investment Project Scheduling ProblemsIEEE Transactions on Evolutionary Computation, 2014
- Multi-objective optimization model for multi-project scheduling on critical chainAdvances in Engineering Software, 2014
- An evolutionary multi-objective scenario-based approach for Stochastic Resource Investment Project Scheduling2011
- Achieving On-Time Delivery: A Two-Stage Probabilistic Scheduling Strategy for Software Projects2009
- LSSPER: Solving the Resource-Constrained Project Scheduling Problem with Large Neighbourhood SearchAnnals of Operations Research, 2004
- A simulation and genetic algorithm approach to stochastic research constrained project scheduling2002
- Project Scheduling Under Partially Renewable Resource ConstraintsManagement Science, 1999