Nestor Raul Ortiz Pimiento
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Nestor Raul Ortiz Pimiento has a total of 7 co-authors. Here are the top co-authors by number of shared publications:
- Francisco Javier Díaz Serna
Universidad Nacional de Colombia
4 shared publications - Erika Tatiana Ruiz Orjuela
Universidad Nacional de Colombia
2 shared publications - Fernando Plazas-Niño
Imperial College London
2 shared publications - Diego Andrés Carreño Dueñas
Universidad Pedagógica y Tecnológica de Colombia
1 shared publication E.G. Montes-Páez
1 shared publicationJ. Quirós-Tortós
School of Electrical Engineering, University of Costa Rica, San José, Costa Rica
1 shared publication
Latest Publications
- Open Access
- 26 May 2023
- Published by Elsevier in Data in Brief
- Vol. 48, 109268
Supporting energy system modelling in developing countries: Techno-economic energy dataset for open modelling of decarbonization pathways in Colombia
- 26 May 2023
- Published by Elsevier in Data in Brief
- Vol. 48, 109268
Open AccessSupporting energy system modelling in developing countries: Techno-economic energy dataset for open modelling of decarbonization pathways in Colombia
- Open Access
- 1 March 2023
- Published by Universidad de Medellin in Revista Ingenierías Universidad de Medellín
- Vol. 22 (42) , 1-18
ELABORACIÓN DEL MODELO ESTRUCTURAL INTERPRETATIVO PARA LA IDENTIFICACIÓN DE FACTORES CLAVES EN LA IMPLEMENTACIÓN DE LEAN HEALTHCARE EN EL CONTEXTO COLOMBIANO
La filosofía lean ha demostrado beneficios en organizaciones de diferentes sectores empresariales por medio de la eliminación de desperdicios y la generación de valor. Las investigaciones realizadas en este campo han buscado identificar los factores críticos de éxito para su implementación. El objetivo de este estudio es comprender las relaciones entre los factores de las Instituciones Prestadoras de Salud en Colombia. Para lograrlo, se realizaron encuestas a expertos y posteriormente se clasificaron estos factores según su poder de influencia y dependencia utilizando la metodología de Interpretative Structural Modelling- ISM. Los resultados de esta investigación contribuyen a identificar los factores claves para la implementación Lean Healthcare en el contexto colombiano: el compromiso de la dirección, la comprensión de la dirección y la formación de los empleados. Por último se presentan recomendaciones y futuros trabajos de investigación.
- 1 March 2023
- Published by Universidad de Medellin in Revista Ingenierías Universidad de Medellín
- Vol. 22 (42) , 1-18
Open AccessELABORACIÓN DEL MODELO ESTRUCTURAL INTERPRETATIVO PARA LA IDENTIFICACIÓN DE FACTORES CLAVES EN LA IMPLEMENTACIÓN DE LEAN HEALTHCARE EN EL CONTEXTO COLOMBIANO
La filosofía lean ha demostrado beneficios en organizaciones de diferentes sectores empresariales por medio de la eliminación de desperdicios y la generación de valor. Las investigaciones realizadas en este campo han buscado identificar los factores críticos de éxito para su implementación. El objetivo de este estudio es comprender las relaciones entre los factores de las Instituciones Prestadoras de Salud en Colombia. Para lograrlo, se realizaron encuestas a expertos y posteriormente se clasificaron estos factores según su poder de influencia y dependencia utilizando la metodología de Interpretative Structural Modelling- ISM. Los resultados de esta investigación contribuyen a identificar los factores claves para la implementación Lean Healthcare en el contexto colombiano: el compromiso de la dirección, la comprensión de la dirección y la formación de los empleados. Por último se presentan recomendaciones y futuros trabajos de investigación.
- Top Cited PapersOpen Access
- 12 April 2022
- Published by Elsevier in Renewable and Sustainable Energy Reviews
- Vol. 162
National energy system optimization modelling for decarbonization pathways analysis: A systematic literature review
- 12 April 2022
- Published by Elsevier in Renewable and Sustainable Energy Reviews
- Vol. 162
Top Cited PapersOpen AccessNational energy system optimization modelling for decarbonization pathways analysis: A systematic literature review
- Open Access
- 1 January 2020
- Published by Universidad Nacional de Colombia in DYNA
- Vol. 87 (212) , 179-188
An optimization model to solve the resource constrained project scheduling problem RCPSP in new product development projects•
New product development projects (NPDP) face different risks that may affect the scheduling. In this article, the purpose was to develop an optimization model to solve the RCPSP in NPDP and obtain a robust baseline for the project. The proposed model includes three stages: the identification of the project’s risks, an estimation of activities’ duration, and the resolution of an integer linear program. Two versions of the model were designed and compared in order to select the best one. The first version uses a method to estimate the activities’ duration based on the expected value of the impact of the risks and the second version uses a method based on the judgmental risk analysis process. Finally, the two version of the model were applied to a case study and the best version of the model was identified using a robustness indicator that analyses the start times of the baselines generated.
- 1 January 2020
- Published by Universidad Nacional de Colombia in DYNA
- Vol. 87 (212) , 179-188
Open AccessAn optimization model to solve the resource constrained project scheduling problem RCPSP in new product development projects•
New product development projects (NPDP) face different risks that may affect the scheduling. In this article, the purpose was to develop an optimization model to solve the RCPSP in NPDP and obtain a robust baseline for the project. The proposed model includes three stages: the identification of the project’s risks, an estimation of activities’ duration, and the resolution of an integer linear program. Two versions of the model were designed and compared in order to select the best one. The first version uses a method to estimate the activities’ duration based on the expected value of the impact of the risks and the second version uses a method based on the judgmental risk analysis process. Finally, the two version of the model were applied to a case study and the best version of the model was identified using a robustness indicator that analyses the start times of the baselines generated.
- Open Access
- 26 September 2019
- Published by Polish Academy of Sciences Chancellery in Management and Production Engineering Review
- Vol. 10 (3) , 73-80
A comparison of different redundancy based methods to solve the project scheduling problemwith probabilistic activivies duration
Redundancy based methods are proactive scheduling methods for solving the Project Scheduling Problem (PSP) with non-deterministic activities duration. The fundamental strategy of these methods is to estimate the activities duration by adding extra time to the original duration. The extra time allows to consider the risks that may affect the activities durations and to reduce the number of adjustments to the baseline generated for the project. In this article, four methods based on redundancies were proposed and compared from two robustness indicators. These indicators were calculated after running a simulation process. On the other hand, linear programming was applied as the solution technique to generate the baselines of 480 projects analyzed. Finally, the results obtained allowed to identify the most adequate method to solve the PSP with probabilistic activity duration and generate robust baselines.
- 26 September 2019
- Published by Polish Academy of Sciences Chancellery in Management and Production Engineering Review
- Vol. 10 (3) , 73-80
Open AccessA comparison of different redundancy based methods to solve the project scheduling problemwith probabilistic activivies duration
Redundancy based methods are proactive scheduling methods for solving the Project Scheduling Problem (PSP) with non-deterministic activities duration. The fundamental strategy of these methods is to estimate the activities duration by adding extra time to the original duration. The extra time allows to consider the risks that may affect the activities durations and to reduce the number of adjustments to the baseline generated for the project. In this article, four methods based on redundancies were proposed and compared from two robustness indicators. These indicators were calculated after running a simulation process. On the other hand, linear programming was applied as the solution technique to generate the baselines of 480 projects analyzed. Finally, the results obtained allowed to identify the most adequate method to solve the PSP with probabilistic activity duration and generate robust baselines.
- Open Access
- 25 June 2019
- Published by Universidad Pedagogica y Tecnologica de Colombia in Revista Facultad de Ingeniería
- Vol. 28 (52) , 77-97
Relative Average Deviation as Measure of Robustness in the Stochastic Project Scheduling Problem
In the Project Scheduling Problem (PSP), the solution robustness can be understood as the capacity that a baseline has to support the disruptions generated by unplanned events (risks). A robust baseline of the project can be obtained from redundancy based methods, which are considered proactive methods to solve the stochastic project scheduling problem. In this research, three redundancy based methods are evaluated and their performance is compared in terms of robustness. These methods add extra time to the original activities duration in order to face the eventualities that may appear during the project execution. In this article a new indicator to analyze the solution robustness to the Project Scheduling Problem with random duration of activities is proposed. This indicator called Relative Average Deviation (RAD) is defined as the margin of deviation of the activities’ start times in relation to their durations. The RAD is based in a traditional concept that seeks to minimize the value of the differences between the planned start times and the real executed start times. The planned start times were obtained from the project baseline generated by each redundancy based method and the real executed start times were obtained from a simulation process based on Monte Carlo technique. The new indicator was used to evaluate the robustness of three baselines generated by different methods but applied to the same case study. Finally, the results suggest that the Relative Average Deviation (RAD) facilitates the interpretation of the robustness concept because it focuses on analyzing the deviation margin associated with an activity.
- 25 June 2019
- Published by Universidad Pedagogica y Tecnologica de Colombia in Revista Facultad de Ingeniería
- Vol. 28 (52) , 77-97
Open AccessRelative Average Deviation as Measure of Robustness in the Stochastic Project Scheduling Problem
In the Project Scheduling Problem (PSP), the solution robustness can be understood as the capacity that a baseline has to support the disruptions generated by unplanned events (risks). A robust baseline of the project can be obtained from redundancy based methods, which are considered proactive methods to solve the stochastic project scheduling problem. In this research, three redundancy based methods are evaluated and their performance is compared in terms of robustness. These methods add extra time to the original activities duration in order to face the eventualities that may appear during the project execution. In this article a new indicator to analyze the solution robustness to the Project Scheduling Problem with random duration of activities is proposed. This indicator called Relative Average Deviation (RAD) is defined as the margin of deviation of the activities’ start times in relation to their durations. The RAD is based in a traditional concept that seeks to minimize the value of the differences between the planned start times and the real executed start times. The planned start times were obtained from the project baseline generated by each redundancy based method and the real executed start times were obtained from a simulation process based on Monte Carlo technique. The new indicator was used to evaluate the robustness of three baselines generated by different methods but applied to the same case study. Finally, the results suggest that the Relative Average Deviation (RAD) facilitates the interpretation of the robustness concept because it focuses on analyzing the deviation margin associated with an activity.
- Open Access
- 6 February 2018
- Published by Omnia Publisher SL in Journal of Industrial Engineering and Management
- Vol. 11 (1) , 116-134
The project scheduling problem with non-deterministic activities duration: A literature review
Purpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with non-deterministic activities duration.Design/methodology/approach: This paper presents an exhaustive literature review, identifying the existing models where the activities duration were taken as uncertain or random parameters. In order to get published articles since 1996, was employed the Scopus database. The articles were selected on the basis of reviews of abstracts, methodologies, and conclusions. The results were classified according to following characteristics: year of publication, mathematical representation of the activities duration, solution techniques applied, and type of problem solved.Findings: Genetic Algorithms (GA) was pointed out as the main solution technique employed by researchers, and the Resource-Constrained Project Scheduling Problem (RCPSP) as the most studied type of problem. On the other hand, the application of new solution techniques, and the possibility of incorporating traditional methods into new PSP variants was presented as research trends.Originality/value: This literature review contents not only a descriptive analysis of the published articles but also a statistical information section in order to examine the state of the research activity carried out in relation to the Project Scheduling Problem with non-deterministic activities duration.
- 6 February 2018
- Published by Omnia Publisher SL in Journal of Industrial Engineering and Management
- Vol. 11 (1) , 116-134
Open AccessThe project scheduling problem with non-deterministic activities duration: A literature review
Purpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with non-deterministic activities duration.Design/methodology/approach: This paper presents an exhaustive literature review, identifying the existing models where the activities duration were taken as uncertain or random parameters. In order to get published articles since 1996, was employed the Scopus database. The articles were selected on the basis of reviews of abstracts, methodologies, and conclusions. The results were classified according to following characteristics: year of publication, mathematical representation of the activities duration, solution techniques applied, and type of problem solved.Findings: Genetic Algorithms (GA) was pointed out as the main solution technique employed by researchers, and the Resource-Constrained Project Scheduling Problem (RCPSP) as the most studied type of problem. On the other hand, the application of new solution techniques, and the possibility of incorporating traditional methods into new PSP variants was presented as research trends.Originality/value: This literature review contents not only a descriptive analysis of the published articles but also a statistical information section in order to examine the state of the research activity carried out in relation to the Project Scheduling Problem with non-deterministic activities duration.
- Open Access
- 30 December 2015
- Published by Universidad Tecnologica de Pereira - UTP in Scientia et technica
- Vol. 20 (4) , 358-365
LEAN HEALTHCARE: UNA REVISIÓN BIBLIOGRÁFICA Y FUTURAS LÍNEAS DE INVESTIGACIÓN
La filosofía Lean a través del tiempo ha evolucionado y ha sido implementada en varios tipos de empresas tanto en el sector manufacturero como en el de los servicios, lo cual se evidencia en el gran número de estudios que investigan sobre la implementación de lean en dichos sectores. El propósito de este estudio es analizar las tendencias de las publicaciones, identificar los autores más influyentes y describir las futuras investigaciones en la aplicación de Lean en el sector salud. En esta investigación se presentan los resultados de un análisis bibliométrico realizadas a las publicaciones científicas acerca de la filosofía Lean Healthcare durante el periodo 1990-2015, en la base de datos: Isi Web of Knowladge, Scopus y PubMed. Los resultados de esta investigación contribuyen a identificar tópicos emergentes y ser un marco de referencia para futuras investigaciones en este tema de investigación.
- 30 December 2015
- Published by Universidad Tecnologica de Pereira - UTP in Scientia et technica
- Vol. 20 (4) , 358-365
Open AccessLEAN HEALTHCARE: UNA REVISIÓN BIBLIOGRÁFICA Y FUTURAS LÍNEAS DE INVESTIGACIÓN
La filosofía Lean a través del tiempo ha evolucionado y ha sido implementada en varios tipos de empresas tanto en el sector manufacturero como en el de los servicios, lo cual se evidencia en el gran número de estudios que investigan sobre la implementación de lean en dichos sectores. El propósito de este estudio es analizar las tendencias de las publicaciones, identificar los autores más influyentes y describir las futuras investigaciones en la aplicación de Lean en el sector salud. En esta investigación se presentan los resultados de un análisis bibliométrico realizadas a las publicaciones científicas acerca de la filosofía Lean Healthcare durante el periodo 1990-2015, en la base de datos: Isi Web of Knowladge, Scopus y PubMed. Los resultados de esta investigación contribuyen a identificar tópicos emergentes y ser un marco de referencia para futuras investigaciones en este tema de investigación.
- Open Access
- 21 November 2012
- Published by Universidad Icesi in Estudios Gerenciales
- p. 13-22
Una revisión de los modelos de mejoramiento de procesos con enfoque en el rediseño
Este artículo revisa la literatura sobre los diferentes modelos para el mejoramiento de procesos desarrollados como elemento clave para alinear las operaciones de las empresas con sus prioridades estratégicas. El objetivo es proporcionar información útil sobre la anatomía de la literatura en esta área de conocimiento, presentando un marco unificado de los artículos explorados cronológicamente, a partir de los tres principales enfoques para el mejoramiento de procesos. El análisis se centra en 11 modelos con un enfoque en el rediseño y examina las características subyacentes y la metodología estructurada, los aportes y diferencias entre los constructos manejados por sus autores. Adicionalmente, se revisan los aspectos positivos y aquellos que pueden ser complementados para mejorar su aplicabilidad en las empresas
- 21 November 2012
- Published by Universidad Icesi in Estudios Gerenciales
- p. 13-22
Open AccessUna revisión de los modelos de mejoramiento de procesos con enfoque en el rediseño
Este artículo revisa la literatura sobre los diferentes modelos para el mejoramiento de procesos desarrollados como elemento clave para alinear las operaciones de las empresas con sus prioridades estratégicas. El objetivo es proporcionar información útil sobre la anatomía de la literatura en esta área de conocimiento, presentando un marco unificado de los artículos explorados cronológicamente, a partir de los tres principales enfoques para el mejoramiento de procesos. El análisis se centra en 11 modelos con un enfoque en el rediseño y examina las características subyacentes y la metodología estructurada, los aportes y diferencias entre los constructos manejados por sus autores. Adicionalmente, se revisan los aspectos positivos y aquellos que pueden ser complementados para mejorar su aplicabilidad en las empresas