A qualitative framework for selection of optimization algorithm for multi-objective trade-off problem in construction projects
- 16 May 2019
- journal article
- research article
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 26 (9) , 1924-1945
Abstract
Purpose: The purpose of this paper is to develop a qualitative framework for the selection of the most appropriate optimization algorithm for the multi-objective trade-off problem (MOTP) in construction projects based on the predefined performance parameters. Design/methodology/approach: A total of 6 optimization algorithms and 13 performance parameters were identified through literature review. The experts were asked to indicate their preferences between each pair of optimization algorithms and performance parameters. A multi-criteria decision-making tool, namely, consistent fuzzy preference relation was applied to analyze the responses of the experts. The results from the analysis were applied to evaluate their relative weights which were used to provide a ranking to the algorithms. Findings: This study provided a qualitative framework which can be used to identify the most appropriate optimization algorithm for the MOTP beforehand. The outcome suggested that non-dominated sorting genetic algorithm (NSGA) was the most appropriate algorithm whereas linear programming was found to be the least appropriate for MOTPs. Originality/value: The devised framework may provide a useful insight for the construction practitioners to choose an effective optimization algorithm tool for preparing an efficient project schedule aiming toward the desired optimal improvement in achieving the various objectives. Identification of the absolute best optimization algorithm is very difficult to attain due to various problems such as the inherent complexities and intricacies of the algorithm and different class of problems. However, the devised framework offers a primary insight into the selection of the most appropriate alternative among the available algorithms.Keywords
This publication has 69 references indexed in Scilit:
- RANKING THE STRATEGIES OF MINING SECTOR THROUGH ANP AND TOPSIS IN A SWOT FRAMEWORK / GAVYBOS SEKTORIAUS STRATEGIJŲ RANGAVIMAS TAIKANT ANP, TOPSIS IR SSGG METODUSJournal of Business Economics and Management, 2011
- Augmented heuristic algorithm for multi-skilled resource schedulingAutomation in Construction, 2011
- Fuzzy-multi-objective particle swarm optimization for time–cost–quality tradeoff in constructionAutomation in Construction, 2010
- A genetic algorithm-based method for scheduling repetitive construction projectsAutomation in Construction, 2009
- Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraintsAutomation in Construction, 2009
- Critical path determination by incorporating minimum and maximum time and distance constraints into linear schedulingEngineering, Construction and Architectural Management, 2004
- On self-adaptive features in real-parameter evolutionary algorithmsIEEE Transactions on Evolutionary Computation, 2001
- Graphically based LP modelling for linear scheduling analysis: the POLO systemEngineering, Construction and Architectural Management, 2000
- The LP/IP hybrid method for construction time-cost trade-off analysisConstruction Management and Economics, 1996
- A scaling method for priorities in hierarchical structuresJournal of Mathematical Psychology, 1977