Kamalendra Kumar Tripathi
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Previous Organizations / Institutes
The organizations / institutes from the scholar's other articles in the past ten years
Research Subjects
Kamalendra Kumar Tripathi has a total of 17 co-authors. Here are the top co-authors by number of shared publications:
Kumar Neeraj Jha
Indian Institute of Technology Delhi
7 shared publications- Kumar Neeraj Jha
Indian Institute of Technology Delhi
6 shared publications - Aman Ahlawat
Indian Institute of Technology Delhi
2 shared publications Debasis Sarkar
Pandit Deendayal Energy Univ
2 shared publicationsRouzbeh Maddah
Indian Institute of Technology Delhi
2 shared publicationsA. K. Jain
Indian Institute of Technology Delhi
1 shared publication
Latest Publications
- 1 December 2026
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 152 (12) , 04026221
Optimization of Capital Structure for Student Housing through the Public–Private Partnership Model in Higher Educational Institutions
The public–private partnership (PPP) model can serve as a sustainable mechanism to bridge the funding deficit in higher educational institutions (HEIs). Profitability remains a primary objective that compels private partners to bear the risks inherent in this model. This study formulates an optimal PPP capital structure for student housing in Indian HEIs using the ant colony optimization (ACO) algorithm. A multiobjective model balancing private profitability, student affordability, and public funding was validated through a case study at Indian Institute of Technology (IIT) Madras. The optimal solution, achieved at a 60% viability gap funding (VGF) level, a 5.55% loan rate, and a rent of USD 852, yielded an equity internal rate of return (EIRR) of 11.03%. The Pareto-front analysis further identified alternative optimal capital structures. Of the 41 feasible solutions, 23 were identified as Pareto-optimal, providing stakeholders with the flexibility to adopt the most suitable capital structure for each project. The nondominated solution set included alternatives with 80% and 60% viability gap funding at a 5.55% loan rate. The findings suggest that PPP-based student housing is financially viable and policy-ready. Student housing in India is a promising emerging real estate sector characterized by low risk, rising enrollment, and stable income streams.
- 1 December 2026
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 152 (12) , 04026221
Optimization of Capital Structure for Student Housing through the Public–Private Partnership Model in Higher Educational Institutions
The public–private partnership (PPP) model can serve as a sustainable mechanism to bridge the funding deficit in higher educational institutions (HEIs). Profitability remains a primary objective that compels private partners to bear the risks inherent in this model. This study formulates an optimal PPP capital structure for student housing in Indian HEIs using the ant colony optimization (ACO) algorithm. A multiobjective model balancing private profitability, student affordability, and public funding was validated through a case study at Indian Institute of Technology (IIT) Madras. The optimal solution, achieved at a 60% viability gap funding (VGF) level, a 5.55% loan rate, and a rent of USD 852, yielded an equity internal rate of return (EIRR) of 11.03%. The Pareto-front analysis further identified alternative optimal capital structures. Of the 41 feasible solutions, 23 were identified as Pareto-optimal, providing stakeholders with the flexibility to adopt the most suitable capital structure for each project. The nondominated solution set included alternatives with 80% and 60% viability gap funding at a 5.55% loan rate. The findings suggest that PPP-based student housing is financially viable and policy-ready. Student housing in India is a promising emerging real estate sector characterized by low risk, rising enrollment, and stable income streams.
- 1 November 2026
- Published by American Society of Civil Engineers (ASCE) in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
- Vol. 18 (4)
Blockchain-Integrated PROMETHEE Framework for Legal Risk Prioritization in High Speed–Rail Project Construction Disputes: A Case Study
Construction disputes in large infrastructure projects often stem from inadequately defined contractual obligations, misaligned risk allocation, and technical uncertainties. In high-speed rail (HSR) developments, these issues are exacerbated by the scale, complexity, and multiplicity of stakeholders involved. This study investigates the prioritization of key performance indicators (KPIs) associated with construction disputes in the Mumbai–Ahmedabad high-speed rail (MAHSR) project, India’s flagship bullet train initiative. Using expert input from 54 professionals across legal, engineering, and project management domains, the preference ranking organization method for enrichment evaluation (PROMETHEE) multicriteria decision-making method was applied to rank legal, contractual, and technical risks contributing to disputes. The most critical factors identified include ambiguous risk allocation clauses, design errors, building information modeling (BIM) clashes, noncompliance with environmental regulations, geotechnical data mismanagement, and delayed contractor payments. A sensitivity analysis confirms the robustness of these findings across different weighting scenarios. The study also explores the potential of blockchain-enabled smart contracts to enhance transparency, automate compliance, and improve dispute resolution processes. The findings provide actionable insights for legal professionals, project managers, and policymakers involved in HSR and similar large infrastructure projects, emphasizing the need for meticulous contract drafting, proactive risk allocation, and strategic integration of digital technologies. The research contributes to the theoretical understanding of risk allocation and dispute causation, while offering practical insights for fostering more resilient and collaborative project environments.
- 1 November 2026
- Published by American Society of Civil Engineers (ASCE) in Journal of Legal Affairs and Dispute Resolution in Engineering and Construction
- Vol. 18 (4)
Blockchain-Integrated PROMETHEE Framework for Legal Risk Prioritization in High Speed–Rail Project Construction Disputes: A Case Study
Construction disputes in large infrastructure projects often stem from inadequately defined contractual obligations, misaligned risk allocation, and technical uncertainties. In high-speed rail (HSR) developments, these issues are exacerbated by the scale, complexity, and multiplicity of stakeholders involved. This study investigates the prioritization of key performance indicators (KPIs) associated with construction disputes in the Mumbai–Ahmedabad high-speed rail (MAHSR) project, India’s flagship bullet train initiative. Using expert input from 54 professionals across legal, engineering, and project management domains, the preference ranking organization method for enrichment evaluation (PROMETHEE) multicriteria decision-making method was applied to rank legal, contractual, and technical risks contributing to disputes. The most critical factors identified include ambiguous risk allocation clauses, design errors, building information modeling (BIM) clashes, noncompliance with environmental regulations, geotechnical data mismanagement, and delayed contractor payments. A sensitivity analysis confirms the robustness of these findings across different weighting scenarios. The study also explores the potential of blockchain-enabled smart contracts to enhance transparency, automate compliance, and improve dispute resolution processes. The findings provide actionable insights for legal professionals, project managers, and policymakers involved in HSR and similar large infrastructure projects, emphasizing the need for meticulous contract drafting, proactive risk allocation, and strategic integration of digital technologies. The research contributes to the theoretical understanding of risk allocation and dispute causation, while offering practical insights for fostering more resilient and collaborative project environments.
- 13 October 2026
- Published by Emerald Publishing in Built Environment Project and Asset Management
- Vol. 16 (6) , 1266-1280
Urban pavement condition assessment with hyperspectral remote sensing: a case study of concrete pavements
Purpose: Concrete pavements are vital to transportation infrastructure, yet their timely condition assessment remains a major challenge because conventional monitoring techniques, such as visual inspection and the Pavement Condition Index (PCI), are often costly, time-consuming, and spatially constrained. This study examines the applicability and reliability of hyperspectral remote sensing as a non-destructive and scalable method for assessing the condition of concrete pavements. Design/methodology/approach: A total of 36 field spectrometer data and Airborne Visible and Infrared Imaging Spectrometer–Next Generation imagery were integrated to analyze concrete pavements. Reflectance data from normal and cracked surfaces were compared to identify diagnostic absorption features and quantify spectral indices, including normalized indices, near-infrared (NIR), and shortwave infrared (SWIR) ratios. Findings: The analysis revealed distinct absorption bands at approximately 478 nm, 1,060 nm, and 2,207 nm, corresponding to iron oxide, hygroscopic water, and clay minerals, respectively. Compared with normal surfaces, cracked pavements exhibited a 10–15% decrease in overall reflectance and a significant increase in spectral indices. Regression analysis demonstrated a strong field-to-image correlation (R2 = 0.77–0.81), confirming methodological reliability. Research limitations/implications: The study is limited to one urban context; validation is required across diverse regions, materials, and traffic conditions. Practical implications: The approach provides a robust and cost-effective method for assessing pavement conditions. Combining field spectroscopy with airborne hyperspectral imagery enables the early detection of deterioration and scalable monitoring to support innovative infrastructure management. Originality/value: This research presents a novel framework for monitoring concrete pavements in India, demonstrating the potential of hyperspectral remote sensing to enhance large-scale urban road assessments.
- 13 October 2026
- Published by Emerald Publishing in Built Environment Project and Asset Management
- Vol. 16 (6) , 1266-1280
Urban pavement condition assessment with hyperspectral remote sensing: a case study of concrete pavements
Purpose: Concrete pavements are vital to transportation infrastructure, yet their timely condition assessment remains a major challenge because conventional monitoring techniques, such as visual inspection and the Pavement Condition Index (PCI), are often costly, time-consuming, and spatially constrained. This study examines the applicability and reliability of hyperspectral remote sensing as a non-destructive and scalable method for assessing the condition of concrete pavements. Design/methodology/approach: A total of 36 field spectrometer data and Airborne Visible and Infrared Imaging Spectrometer–Next Generation imagery were integrated to analyze concrete pavements. Reflectance data from normal and cracked surfaces were compared to identify diagnostic absorption features and quantify spectral indices, including normalized indices, near-infrared (NIR), and shortwave infrared (SWIR) ratios. Findings: The analysis revealed distinct absorption bands at approximately 478 nm, 1,060 nm, and 2,207 nm, corresponding to iron oxide, hygroscopic water, and clay minerals, respectively. Compared with normal surfaces, cracked pavements exhibited a 10–15% decrease in overall reflectance and a significant increase in spectral indices. Regression analysis demonstrated a strong field-to-image correlation (R2 = 0.77–0.81), confirming methodological reliability. Research limitations/implications: The study is limited to one urban context; validation is required across diverse regions, materials, and traffic conditions. Practical implications: The approach provides a robust and cost-effective method for assessing pavement conditions. Combining field spectroscopy with airborne hyperspectral imagery enables the early detection of deterioration and scalable monitoring to support innovative infrastructure management. Originality/value: This research presents a novel framework for monitoring concrete pavements in India, demonstrating the potential of hyperspectral remote sensing to enhance large-scale urban road assessments.
- 1 April 2026
- Published by Emerald Publishing in Built Environment Project and Asset Management
- Vol. 16 (5) , 1-19
Factors responsible for the communication gap in construction projects: an empirical study
Purpose: Effective communication is vital for construction projects, ensuring stakeholder alignment and collaboration. However, communication gaps often arise, leading to inefficiencies, delays and increased costs. This study aims to analyze the factors responsible for communication gaps in construction projects and assess their criticality and impact on project performance. Design/methodology/approach: This study adopts a quantitative approach, beginning with a literature review identifying 30 communication attributes and a questionnaire survey administered to 110 construction professionals in India. Statistical techniques, including factor analysis and fuzzy synthetic evaluation, were employed to assess the significance of these attributes. Findings: Factor analysis extracted seven key communication factors: communication and planning deficiencies, operational and supervisory challenges, leadership and technological gaps, stakeholder and team diversity, behavioral and contractual barriers, commitment and prioritization issues, and project complexity. Fuzzy synthetic evaluation revealed that communication and planning deficiencies, and operational and supervisory challenges are the most critical factors, significantly impacting communication effectiveness in Indian construction projects. Research limitations/implications: The findings are based on the perceptions of construction professionals and may be influenced by regional or sector-specific practices. Practical implications: The study offers insights into the key drivers of communication gaps. It emphasizes the need for robust communication strategies, detailed planning and better supervision to mitigate risks, boost collaboration and productivity, reduce rework, and improve project outcomes. Originality/value: The findings provide a novel quantitative framework for evaluating communication gaps, particularly in under-researched Indian construction projects.
- 1 April 2026
- Published by Emerald Publishing in Built Environment Project and Asset Management
- Vol. 16 (5) , 1-19
Factors responsible for the communication gap in construction projects: an empirical study
Purpose: Effective communication is vital for construction projects, ensuring stakeholder alignment and collaboration. However, communication gaps often arise, leading to inefficiencies, delays and increased costs. This study aims to analyze the factors responsible for communication gaps in construction projects and assess their criticality and impact on project performance. Design/methodology/approach: This study adopts a quantitative approach, beginning with a literature review identifying 30 communication attributes and a questionnaire survey administered to 110 construction professionals in India. Statistical techniques, including factor analysis and fuzzy synthetic evaluation, were employed to assess the significance of these attributes. Findings: Factor analysis extracted seven key communication factors: communication and planning deficiencies, operational and supervisory challenges, leadership and technological gaps, stakeholder and team diversity, behavioral and contractual barriers, commitment and prioritization issues, and project complexity. Fuzzy synthetic evaluation revealed that communication and planning deficiencies, and operational and supervisory challenges are the most critical factors, significantly impacting communication effectiveness in Indian construction projects. Research limitations/implications: The findings are based on the perceptions of construction professionals and may be influenced by regional or sector-specific practices. Practical implications: The study offers insights into the key drivers of communication gaps. It emphasizes the need for robust communication strategies, detailed planning and better supervision to mitigate risks, boost collaboration and productivity, reduce rework, and improve project outcomes. Originality/value: The findings provide a novel quantitative framework for evaluating communication gaps, particularly in under-researched Indian construction projects.