Abstract
With the increasing penetration of primarily inertia-less distributed energy resources, allowable delay in the fast frequency reserve provision to ensure marginal stability condition can become comparable with the requisite dead-time for fast-switching in a radial power distribution system (PDS) connected to the transmission system. Consequently, the prevailing short-duration load-generation imbalance might propagate as system-wide frequency excursion in the future power system, which traditionally has not been observed. Furthermore, during the fast-switching, some of the fast-acting reserve (FAR) providing local generators remain inaccessible to the bulk power system (BPS). This work has answered the questions of requisite reserve requirements to cater to such events through efficient energy and FAR provision joint-scheduling. Stochasticity of fast-switching, with temporary faults as a use-case, requires modeling of load-generation imbalance and local resource unavailability, vis-á-vis FAR requirement problem, as a chance-constraint. Due to the limited visibility at the BPS level, PDS operators must ensure sufficient FAR availability for a given confidence level of the chance-constraint. Individual chance-constraints are used to ensure mathematical simplicity. Here, the PDS is operated as a virtual power plant (VPP), where the operator can procure resources locally or from the wholesale market with the aim of profit maximization before the contingency occurs. Results show that FAR requirements can influence the local energy schedule and raise energy costs. Furthermore, the confidence level of the chance-constraint can impact overall profitability, and FAR should be scheduled carefully. Comparative analysis with a modified benchmark IEEE 33-node radial test system and a 98-node test system shows the superior performance of the proposed approach. The impact of the limited available FAR is also demonstrated.Keywords
Funding Information
- IPTA and UPA Scholarship from UOW
- MHRD of GoI
- DOE UI-ASSIST
This publication has 34 references indexed in Scilit:
- The relevance of inertia in power systemsRenewable and Sustainable Energy Reviews, 2016
- Distributed generation and its impact on power grids and microgrids protection2012
- Intelligent fuse-saving2012
- SCUC With Hourly Demand Response Considering Intertemporal Load CharacteristicsIEEE Transactions on Smart Grid, 2011
- Value-at-Risk vs. Conditional Value-at-Risk in Risk Management and Optimization2008
- Virtual power plant and system integration of distributed energy resourcesIET Renewable Power Generation, 2007
- Hourly electricity prices in day-ahead marketsEnergy Economics, 2007
- Convex Approximations of Chance Constrained ProgramsSIAM Journal on Optimization, 2007
- Development of Adaptive Protection Scheme for Distribution Systems With High Penetration of Distributed GenerationIEEE Transactions on Power Delivery, 2004
- Conditional value-at-risk for general loss distributionsJournal of Banking & Finance, 2002