Design of a Throttled Surge Tank for Refurbishment by Increase of Installed Capacity at a High-Head Power Plant
Authors:
- 1 February 2018
- journal article
- research article
- Published by American Society of Civil Engineers (ASCE) in Journal of Hydraulic Engineering
- Vol. 144 (2)
Abstract
No abstract availableThis publication has 15 references indexed in Scilit:
- Numerical Simulations in Hydraulic Engineering2014
- Numerical and experimental investigation of optimum surge tank forms in hydroelectric power plantsRenewable Energy, 2013
- Determination of Surge Tank Diaphragm Head Losses by CFD Simulations2013
- Coefficients of Local Head Losses in Steady-State Flow of Throttled Surge Tanks with Standpipe by CFDAdvanced Materials Research, 2013
- Simplified Approach for the Optimal Sizing of Throttled Air ChambersJournal of Hydraulic Engineering, 2012
- Modeling of One-Dimensional, Unsteady, Free-Surface, and Pressurized FlowsJournal of Hydraulic Engineering, 2011
- Design of surge tank for water supply systems using the impulse response method with the GA algorithmJournal of Mechanical Science and Technology, 2010
- Impulse Response Method for Pipeline Systems Equipped with Water Hammer Protection DevicesJournal of Hydraulic Engineering, 2008
- High-Order Modeling of Hydraulic Power Plant in Islanded Power NetworkIEEE Transactions on Power Systems, 2007
- Effects of Free Outflow in Rising Mains with Air ChamberJournal of Hydraulic Engineering, 2002