Optimalization of steam control station
- 7 August 2018
- conference paper
- Published by AIP Publishing in AIP Conference Proceedings
- Vol. 2000 (1) , 020016
Abstract
The article deals with the design of a new reduction station. The station serves for backup heating of the hot water heat exchangers. The hot water heating network of the Ledvice power plant is the main system. Back-up heating system has been developed with regard to the enhancement of the heat demand by 1.5 MWt. The existing fluid block and the new supercritical block equipped by granular boiler will be used as a new source of the heat. The main fuel of the boiler is brown coal. A new control station for a steam reduction (demanded for heating of a hot-water circuit) is described.Keywords
This publication has 1 reference indexed in Scilit:
- Determination of pressure drop coefficient by CFD simulationAIP Conference Proceedings, 2014