Cycle Time Estimation of a Multiple Product Production Line: An Approach With Fuzzy and Chance-Constrained Programming
- 1 May 2009
- journal article
- Published by Taylor & Francis in INFOR: Information Systems and Operational Research
- Vol. 47 (2) , 93-103
Abstract
This paper presents an approach to estimate the cycle time of a multi-product production line composed of workstations that are subject to random failure and repair. We utilize chance constrained programming (CCP) to establish an upper bound for the stochastic variables and approximate them with interval variables. Fuzzy linear programming (FLP) is utilized to incorporate the interval variables into the optimization model. We discuss and utilize some of the existing methods of determining production line efficiency as the line efficiency is a component of our proposed model. Numerical examples are presented and the results obtained by the modeling approach are then compared and validated with simulation results.Keywords
This publication has 22 references indexed in Scilit:
- Capacity improvement of an unreliable production line—an analytical approachComputers & Operations Research, 2006
- Capacity estimation of a multi-product unreliable production lineInternational Journal of Production Research, 2002
- A robust decomposition method for the analysis of production lines with unreliable machines and finite buffersAnnals of Operations Research, 2000
- Control policies for multi-product multi-stage manufacturing systems: An experimental approachInternational Journal of Production Research, 1997
- Modeling and Performance Evaluation of Production Lines Using the Modeling Language MOSEL1996
- Manufacturing flow line systems: a review of models and analytical resultsQueueing Systems, 1992
- Decision-Making in a Fuzzy EnvironmentManagement Science, 1970
- PREDICTION OF THE EFFICIENCY OF PRODUCTION SYSTEMS WITHOUT INTERNAL STORAGEInternational Journal of Production Research, 1967
- AUTOMATIC TRANSFER LINES WITH BUFFER STOCKSInternational Journal of Production Research, 1967
- Chance-Constrained ProgrammingManagement Science, 1959