Ozhand Ganjavi
Current Organizations / Institutes
The organizations/institutes from the scholar's latest article
Ozhand Ganjavi has a total of 3 co-authors. Here are the top co-authors by number of shared publications:
- Walid Abdul-Kader
Department of Mechanical, Automotive and Materials Engineering, University of Windsor, Windsor, ON N9B 3P4, Canada
2 shared publications - Min Xu
University of Regina, Regina, SK, Canada S4S 0A2
1 shared publication - Mohammed Fazle Baki
Odette School of Business, University of Windsor, Windsor, Canada
1 shared publication
Latest Publications
- 16 May 2011
- Published by Wiley in International Transactions in Operational Research
- Vol. 18 (5) , 561-577
A nonlinear model for optimizing the performance of a multi-product production line
- 16 May 2011
- Published by Wiley in International Transactions in Operational Research
- Vol. 18 (5) , 561-577
A nonlinear model for optimizing the performance of a multi-product production line
- 1 May 2009
- Published by Taylor & Francis in INFOR: Information Systems and Operational Research
- Vol. 47 (2) , 93-103
Cycle Time Estimation of a Multiple Product Production Line: An Approach With Fuzzy and Chance-Constrained Programming
This paper presents an approach to estimate the cycle time of a multi-product production line composed of workstations that are subject to random failure and repair. We utilize chance constrained programming (CCP) to establish an upper bound for the stochastic variables and approximate them with interval variables. Fuzzy linear programming (FLP) is utilized to incorporate the interval variables into the optimization model. We discuss and utilize some of the existing methods of determining production line efficiency as the line efficiency is a component of our proposed model. Numerical examples are presented and the results obtained by the modeling approach are then compared and validated with simulation results.
- 1 May 2009
- Published by Taylor & Francis in INFOR: Information Systems and Operational Research
- Vol. 47 (2) , 93-103
Cycle Time Estimation of a Multiple Product Production Line: An Approach With Fuzzy and Chance-Constrained Programming
This paper presents an approach to estimate the cycle time of a multi-product production line composed of workstations that are subject to random failure and repair. We utilize chance constrained programming (CCP) to establish an upper bound for the stochastic variables and approximate them with interval variables. Fuzzy linear programming (FLP) is utilized to incorporate the interval variables into the optimization model. We discuss and utilize some of the existing methods of determining production line efficiency as the line efficiency is a component of our proposed model. Numerical examples are presented and the results obtained by the modeling approach are then compared and validated with simulation results.