Risk-Response Strategy Optimization Considering Limited Risk-Related Resource Allocation and Scheduling
- 1 November 2022
- journal article
- research article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 148 (11) , 04022123
Abstract
Effective handling of project risks is an important part of project risk management. Various methods have been proposed to determine the optimal set of risk-response actions (RRAs) to mitigate the project risks. However, few existing methods incorporate resource planning into their selected RRAs. This paper integrates the risk-response problem with the resource-constrained project scheduling problem (RCPSP) and presents a method for allocating and scheduling the limited risk-related (RR) resources to provide project managers with an effective and feasible project risk-response strategy. Based on the elaboration of the relationships between the risk, the RRA, and the RR resource, a mixed-integer optimization model is developed to obtain the optimal risk-response strategy and the consequent project scheduling. A full-factorial numerical experiment is conducted to validate the optimization model and investigate the effects of risk-response efficiency and risk severity on project make-span and total cost. In addition, a model comparison analysis is presented to highlight the necessity of incorporating resource planning. The computational results show that, as expected, resource utilization can be improved by incorporating allocation and scheduling in the risk-response procedure. Also, the study suggests that project managers should avoid RR resource consumption and cost increases caused by excessive risk response in specific circumstances.Keywords
This publication has 63 references indexed in Scilit:
- Interactions-based risk clustering methodologies and algorithms for complex project managementInternational Journal of Production Economics, 2013
- A decision-making tool to maximize chances of meeting project commitmentsInternational Journal of Production Economics, 2013
- Comparison of mixed integer linear programming models for the resource-constrained project scheduling problem with consumption and production of resourcesFlexible Services and Manufacturing Journal, 2012
- Proactive policies for the stochastic resource-constrained project scheduling problemEuropean Journal of Operational Research, 2011
- Using a risk-based approach to project scheduling: A case illustration from semiconductor manufacturingEuropean Journal of Operational Research, 2008
- Risk-Based Resource Optimization for Transmission System MaintenanceIEEE Transactions on Power Systems, 2006
- Project scheduling under uncertainty: Survey and research potentialsEuropean Journal of Operational Research, 2005
- Robust and reactive project scheduling: a review and classification of proceduresInternational Journal of Production Research, 2004
- An integrated approach for risk response development in project planningJournal of the Operational Research Society, 2001
- Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problemEuropean Journal of Operational Research, 2000