YYYuan Yuan

Yuan Yuan

*This is an algorithmically generated author record based on publicly available information.

Current Organizations / Institutes

The organizations/institutes from the scholar's latest article


Yuan Yuan has a total of 2 co-authors. Here are the top co-authors by number of shared publications:

  • Enrico Zio

    Politecnico di Milano

    1 shared publication
  • Fei Zuo

    Postdoctoral Scholar, Dept. of Energy, Politecnico di Milano, Milan 20133, Italy; Associate Professor, College of Economics and Management, Shenyang Aerospace Univ., Shenyang 110136, China

    1 shared publication

Latest Publications

  • Risk-Response Strategy Optimization Considering Limited Risk-Related Resource Allocation and Scheduling

    by Fei Zuo, Enrico Zio, Yuan Yuan

    Effective handling of project risks is an important part of project risk management. Various methods have been proposed to determine the optimal set of risk-response actions (RRAs) to mitigate the project risks. However, few existing methods incorporate resource planning into their selected RRAs. This paper integrates the risk-response problem with the resource-constrained project scheduling problem (RCPSP) and presents a method for allocating and scheduling the limited risk-related (RR) resources to provide project managers with an effective and feasible project risk-response strategy. Based on the elaboration of the relationships between the risk, the RRA, and the RR resource, a mixed-integer optimization model is developed to obtain the optimal risk-response strategy and the consequent project scheduling. A full-factorial numerical experiment is conducted to validate the optimization model and investigate the effects of risk-response efficiency and risk severity on project make-span and total cost. In addition, a model comparison analysis is presented to highlight the necessity of incorporating resource planning. The computational results show that, as expected, resource utilization can be improved by incorporating allocation and scheduling in the risk-response procedure. Also, the study suggests that project managers should avoid RR resource consumption and cost increases caused by excessive risk response in specific circumstances.